首页/ 题库 / [单选题]If the ship is along的答案

If the ship is alongside the wharf,what kind of()is used?

单选题
2022-01-04 10:35
A、pilot ladder
B、rope ladder
C、rod ladder
D、accommodation ladder
查看答案

正确答案
D

试题解析

感兴趣题目
()is the Shipowner’s duty to send the ship to the agreed,or in the absence of special agreement,to the usual place of loading.
It is the responsibility of the Master or person in charge of a ship to ensure that().
It is the responsibility of the Master or person in charge of a ship to ensure that().
If a chartered ship is prevented from,or delayed in,getting to the loading port by peril excepted during the voyage,the exception clauses().
()is entitled to enter into,with a shipper,any agreement,stipulation,condition,reservation or exception as to the responsibility and liability of the carrier or the ship for the loss of or damage to,or in connection with,the custody and care and handling of the goods prior to the loading on,and subsequent to the discharge from,the ship on which the goods are carried by sea.
If the carrier is responsible for the damage or loss of the cargo,()will have to pay to the insurance company.
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
If fuel is burned from only the starboard tanks, the ship will ().
If the scavenge fire is of a more major nature, if there is a risk of the fire extending or if the scavenge trunk is adjacent to the crankcase with risk of a hot spot developing it sometimes becomes necessary to ()the engine.
If you do not know the subject, you will not understand what is said or written, even if English is your mother () what is said or written.
The declaration made by the shipper,if embodied in the bill of lading,is()evidence,but is not binding or conclusive on the carrier.
相关题目

As a rule, the buyer is responsible for        a ship or booking the shipping space.

第一组:When a nominated surveyor or recognized organization determines that the condition of the ship or its equipment does not correspond substantially with the particulars of the Certificate (IOPP) or is such that the ship is not fit to proceed to sea without presenting an unreasonable threat of harm to the marine environment, such surveyor or organization shall immediately ensure that corrective action is taken and shall in due course notify the Administration. If such corrective action is not taken, the Certificate shall be withdrawn and the Administration shall be notified immediately; and if the ship is in a port of another Party, the appropriate authorities of the port State shall also be notified immediately. When an officer of the Administration, a nominated surveyor or a recognized organization has notified the appropriate authorities of the port State, the Government of the port State concerned shall give such officer, surveyor or organization any necessary assistance to carry out their obligations under this regulation. When applicable, the Government of the port State concerned shall take such steps as will ensure that the ship shall not sail until it can proceed to sea or leave the port for the purpose of proceeding to the nearest appropriate repair yard available without presenting an unreasonable threat of harm to the marine environment.Whenever an accident occurs to a ship or a defect is discovered which substantially affects the integrity of the ship or the efficiency or completeness of its equipment covered by this Annex the master or owner of the ship shall report at the earliest opportunity to the Administration, the recognized organization or the nominated surveyor responsible for issuing the relevant Certificate, who shall cause investigations to be initiated to determine whether a survey as required by paragraph 1 of this regulation is necessary. If the ship is in a port of another Party, the master or owner shall also report immediately to the appropriate authorities of the port State and the nominated surveyor or recognized organization shall ascertain that such report has been made.When a ship is found not fit to proceed to sea by a nominated surveyor, then corrective action should be taken and be informed immediately. (1)the master (2)the authorities of port State (3)the Administration
If the goods is damaged or lost in the process of logistics, the shipper can()to the carrier.
Owing to the big draught of the ship,she has to go alongside by the time of().
If the scavenge fire is of a more major nature, if there is a risk of the fire extending or if the scavenge trunk is adjacent to the crankcase with risk of a hot spot developing it sometimes becomes necessary to ()the engine.
If the scavenge fire is of a more major nature, if there is a risk of the fire extending or if the scavenge trunk is adjacent to the crankcase with risk of a hot spot developing it sometimes becomes necessary to_______the engine
The ship is going to get()wharf.
The shipment time is June or July atour()and the good swill be shipped in one().
If the carrier is responsible for the damage or loss of the cargo,()will have to pay to the insurance company.
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
The two courses of action if the underwater hull of a ship is severely damaged are to plug the openings and to().
The operator of the ship’s radiotelephone,if the radiotelephone is carried voluntarily,must hold at least a().
A ship is responsible for the cargo loaded or unloaded().
The man in charge of a ship is().He is responsible for the ship ,her cargo and the safety of the crew.
Where a container,pallet or similar article of transport is used to consolidate goods,the number of packages or units enumerated in the bill of lading as packed in such article of transport()to be the number of packages or units in calculating the amount beyond which the carrier or the ship is not reliable.
If the ship is alongside the wharf,what kind of()is used?
Owing to the big draft,the ship is not permitted to go alongside until the time of().
If the place named for the loading is simply a port or dock,notice of readiness may be given as soon as the ship arrives()although she is not in the particular spot where the loading is to take place.

As a rule, the buyer is responsible for        a ship or booking the shipping space.

A ship can request completion of a () when the ship is at a higher security level than the port facility or another ship it is interfacing with.
广告位招租WX:84302438

免费的网站请分享给朋友吧