首页/ 题库 / [单选题]关于钢结构采用螺栓连接的做法,错误的是(的答案

关于钢结构采用螺栓连接的做法,错误的是()。

单选题
2022-01-04 17:14
A、高强度螺栓的连接摩擦面不涂漆
B、高强度螺栓若不能自由穿入孑1,采用气割扩孔
C、普通螺栓与高强螺栓从中间开始,对称向两边进行紧固
D、高强度螺栓终拧后,螺栓丝扣外露2~3扣,并有10%的外露1扣或4扣
查看答案

正确答案
B

试题解析

相关题目
据建设部《关于印发(注册建造师执业管理办法)(试行)的通知》(建市[2008348号)第五条“大中型工程施工项目负责人必须由本专业注册建造师担任,二级注册建造师可以承担()”。
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

A cabinet or space containing the controls or valves for the fixed firefighting system must be().
) 房屋建筑工程施工一级企业具有一级建造师应不少于( )人。
建筑工程从业人员实行执业资格制度,取得建造师资格,()不得以建造师名义从事建设工程施工项目的管理工作。
Mainly east 3 or 4 partly cloudy to overcast occasional rain()slowly south moderate or good.
()any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local quarantine officer must be notified immediately.
Should any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local Quarantine Officer must be()immediately.
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
根据《注册建造师执业管理办法(试行)》规定,担任建设工程施工项目负责人的注册建造师对其签署的工程管理文件承担相应责任。注册建造师签章完整的工程施工管理文件方为有效。签章完整是指()
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
翻译:With Average or With Particular Average(WA or WPA)()
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
广告位招租WX:84302438

免费的网站请分享给朋友吧