Top N analysis requires () and ().

多选题
2022-01-04 18:05
A、the use of rowid
B、a GROUP BY clause
C、an ORDER BY clause
D、only an inline view
E、an inline view and an outer query
查看答案

正确答案
C| E

试题解析

标签: 1Z0-007
感兴趣题目
In which scenario would TOP N analysis be the best solution? ()
假定利用数组a[N]顺序存储一个栈,用top表示栈顶元素的下标位置,用top= =-1表示栈空,用top= =N - 1表示栈满,则该数组所能存储的栈的最大长度为()
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
You are designing a top-level OU structure to meet the business and technical requirements. Which top-evel OU or OUs should you use?()
You are designing the top-level organizational unit (OU) structure to meet the business and technical requirements. Your design must accommodate the anticipated growth of the company.  Which top-level OU structure should you use?()
Accelerated analysis approaches emphasize the construction of (71) to more rapidly identify business and user requirements for a new system. As an accelerated analysis technology,(72) reads the program code and automatically generates the equivalent system model, and the code can be obtained from (73) All system analysis approaches require some form. of (74) which includes those techniques to be used to identify or extract system problems and solution requirements from user community.(75) is a classical set of techniques used to collect information about system problems, opportunities, solution requirements, and priorities.

You are designing a top-level OU structure to meet the business and technical requirements. 
Which top-evel OU or OUs should you use? ()

当利用大小为N的数组顺序存储一个栈时,假定用栈顶指针top=N+1表示栈空,则向这个栈插入一个元素时,首先应执行______语句修改top指针。
当利用大小为n的数组顺序存储一个栈时,假定用top= =n表示栈空,则向这个栈插入一个元素时,首先应执行(34)语句修改top指针。
●Traditional structured analysis techniques focus upon the flow of(71)within a system Object-oriented analysis emphasizes the building of real-world models It examines requirements from the perspective of the classes and objects found in the vocabulary of the(72)domain
() system is arranged to ensure that water can be drawn from any tank or the sea and discharged to any other tank or the sea as required to trim the vessel.
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
相关题目

Importing and exporting is transferring goods from one country to another while _______ attention to the laws and requirements of bringing goods out or into that country.

假定利用数组a[N]顺序存储一个栈,用top表示栈顶指针,用top=N+1表示栈空,该数组所存储的栈的最大长度为N,则表示栈满的条件为( )。
当利用大小为N的数组顺序存储一个栈时,假定用top==N表示栈空,则向这个栈插入一个元素时,首先应执行下面那个语句修改top指针 ( )。
某零件设计尺寸为4mm,生产过程中允许的误差是(+0.007,-0.007)。某道工序是保证该零件设计尺寸的最后加工工序,现对该道工序的能力进行评估,经抽样测算,样本平均值和公差在中心重合,样本标准差为0.0027。根据以上资料,回答下列问题:该道工序的过程能力指数为()。
In which service component of the optimize phase would you assess the routing and switching systemand recommend activities such as optimizing device configurations, capacity planning, or traffic analysis? ()
Object-oriented analysis (OOA) is a semiformal specification technique for the object-oriented paradigm. Object-oriented analysis consists of three steps. The first step is(1). It determines how the various results are computed by the product and presents this information in the form of a (2) and associated scenarios. The second is (3) , which determines the classes and their attributes, then determines the interrelationships and interaction among the classes. The last step is (4) , which determines the actions performed by or to each class or subclass and presents this information in the form of (5) .

During the project, requirements change for a variety of reasons. As needs change and as work proceeds, additional requirements are derived and changes may have to be made to the existing requirements. It is essential to manage these additions and changes efficiently and effectively. To effectively analyze the impact of the changes, it is necessary that the source of each requirement is known and the rationale for any change is documented. The project manager may, however, want to track appropriate measures of requirements volatility to judge whether new or revised()are necessary.

During the project, requirements change for a variety of reasons. As needs change and as work proceeds, additional requirements are derived and changes may have to be made to the existing requirements. It is essential to manage these additions and changes efficiently and effectively. To effectively analyze the impact of the changes, it is necessary that the source of each requirement is known and the rationale for any change is documented. The project manager may, however, want to track appropriate measures of requirements volatility to judge whether new or revised ( )are necessary.
● During the project, requirements change for a variety of reasons. As needs change and as work proceeds, additional requirements are derived and changes may have to be made to the existing requirements. It is essential to manage these additions and changes efficiently and effectively. To effectively analyze the impact of the changes, it is necessary that the source of each requirement is known and the rationale for any change is documented. The project manager may, however, want to track appropriate measures of requirements volatility to judge whether new or revised (75)are necessary.(75)
During the project, requirements change for a variety of reasons. As needs change and as work proceeds, additional requirements are derived and changes may have to be made to the existing requirements. It is essential to manage these additions and changes efficiently and effectively. To effectively analyze the impact of the changes, it is necessary that the source of each requirement is known and the rationale for any change is documented. The project manager may, however, want to track appropriate measures of requirements volatility to judge whether new or revised(75)are necessary.

The receiving activities conduct analyses of the requirements with the requirements provider to ensure that a compatible, shared understanding is reached on the meaning of the requirements. The result ofthis analysis and dialog is an()set of requirements.

The receiving activities conduct analyses of the requirements with the requirements provider to ensure that a compatible, shared understandin is reached on the meaning of the requirements. The result of this analysis and dialog is an ( )set of requirements.
The receiving activities conduct analyses of the requirements with the requirements provider to ensure that a compatible, shared understanding is reached on the meaning of the requirements. The result of this analysis and dialog is an(74)set of requirements.
A requirement is simply a statement of what the system must do or what characteristics it needs to have. Requirements written from the perspective of user and focus on user needs are called( ). Requirements written from the developer&39;s perspective and describe how the system will be implemented are called( ). Requirements evolve from detailed statemens of business capabilities that a system should have to detailed statements of the technical way in which the capabilities will be implemented in the new system. Requirements can be either functional or nofunctional in nature. For example, during the analysis phase of travel vehicles sales system, the system that must have the ability to search for available inventory is( ). The requirement that the system should be able to work on any Web browser belongs to( ). That customer personal information is protected in compliance with the Data Protection Act is a requirement of( ).
Top N analysis requires () and ().
System analysis is traditionally done top-down using structured analysis based on ( ).
System analysis is traditionally done top-down using structured analysis based on (71) .Object-oriented analysis focuses on creation of models.The three types of the analysis model are (72) .There are two substages of object-oriented analysis. (73) focuses on real-world things whose semantics the application captures.The object constructed in the requirement analysis shows the (74) of the real-world system and organizes it into workable pieces. (75) addresses the computer aspects ofthe application that are visible to users.The objects are those which can be expected to vary from time to time quite rapidly.(71)
● The receiving activities conduct analyses of the requirements with therequirements provider to ensure that a compatible, shared understanding isreached on the meaning of the requirements. The result of this analysis and dialogis an (74) set of requirements.(74)
() unit is mounted so as to raise and lower the cable from the spurling pipe, which is at the top and center of the chain or cable locker.
A requirement is simplya statement of what the system must do or what characteristics it needs to have. Requirements written from the perspective of user and focus on user needs are called _( )_.
广告位招租WX:84302438

免费的网站请分享给朋友吧