首页
题目
TAGS
首页
/
题库
/
[单选题]She()along the path,的答案
搜答案
She()along the path, glad to be able to take her time.
单选题
2022-01-05 15:34
A、hurried
B、marched
C、progressed
D、wandered
查看答案
正确答案
C
试题解析
标签:
成人本科学位英语
CMS专题
感兴趣题目
Routers perform the decision process that selects what path a packet takes. These ( ) layer devices participate it the collection and distribution of network-layer information, and perform Layer 3 switching based on the contents of the network layer ( ) of each packet. You can connect the routers directly by point-to-point ( ) or local-area networks, or you can connect them by LAN or WAN switches. These Layer 2 switches unfortunately do not have the capability to hold Layer 3 ( ) information or to select the path taken by a packet through analysis of its Layer 3 destination address. Thus, Layer 2 switches be involved in the Layer 3 packet ( ) decision process.
A vessel proceeding along the bank of a river or channel has the tendency to().
When your vessel is on or near the path of an approaching tropical storm the().
()is entitled to enter into,with a shipper,any agreement,stipulation,condition,reservation or exception as to the responsibility and liability of the carrier or the ship for the loss of or damage to,or in connection with,the custody and care and handling of the goods prior to the loading on,and subsequent to the discharge from,the ship on which the goods are carried by sea.
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
The goal, which they are unlikely to live to see , is tocure, prevent or manage all diseasesin the next 80or so years.
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
A salvor may be()the whole or part of the payment due under Salvage Convention to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part or if the salvor has been guilty of fraud or other dishonest conduct.
() system is arranged to ensure that water can be drawn from any tank or the sea and discharged to any other tank or the sea as required to trim the vessel.
Strainers, sometimes called (), are devices designed to prevent the passage of unwanted solids into or further along a system.
Never()the lifeboat or lifecraft disengaging locks or hydrostatic release gears because it can cause them to fail to function.
Never()the lifeboat or lifecraft disengaging hocks or hydrostatic release gears because it can cause them to fail to function.
相关题目
I am going away. or not she will go is up to her to decide.
Either she or I______ to attend the get-togather this evening.
When the Pilot is embarked he or she ().
When the pilot is embarked he or she().
According to the western culture, if one is given a compliment, he or she should say“______”.
Where the contract is to insure the subject-matter at and from,or from one place to another or others,the policy is called a().
When a vessel sees the other ahead or nearly ahead,by night she could see the masthead lights of the other in a line or nearly in a line or both side lights,()shall be deemed to exist.
Class I and II private aids to navigation in or along navigable waters of the United States are listed in the().
Which router or router combination is used to calculate the MPLS traffic engineering tunnel path?()
成人高等教育本科生只能在毕业()个月内申请学士学位。
本科毕业生授予学士学位要满足的英语成绩条件以下正确的是()。
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
During loading or discharging,where the delay is due to the Shipowner’s fault,or that of his servants or agents acting within their authority,the time actually delayed is to be()in calculating lay days.
If you must enter a room or compartment to combat the fire, keep an escape path ().
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
Where a container,pallet or similar article of transport is used to consolidate goods,the number of packages or units enumerated in the bill of lading as packed in such article of transport()to be the number of packages or units in calculating the amount beyond which the carrier or the ship is not reliable.
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Each life preserver must be readily accessible to the person for whom it is intended while he or she is().
She()along the path, glad to be able to take her time.
The()enables water to be blow down or emptied from the boilerIt may be used when partially or completely emptying the boiler.
广告位招租WX:84302438
题库考试答案搜索网
免费的网站请分享给朋友吧