首页/ 题库 / [多选题]BIM技术可贯穿工程建设的()全过程。的答案

BIM技术可贯穿工程建设的()全过程。

多选题
2022-01-08 21:55
A、施工
B、设计
C、规划
D、运营
查看答案

正确答案
A| B| C| D

试题解析

感兴趣题目
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
A salvor may be()the whole or part of the payment due under Salvage Convention to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part or if the salvor has been guilty of fraud or other dishonest conduct.
The () is used for hauling in or letting out the wires or ropes.
Vessels must be()valid certificate of nationality or certificated of registry or license.
When loading or discharging dry mud or cement,crew members should use goggles and().
Effects which are dutiable or subject to prohibitions or restrictions should be declared in ().
对于全球最早发展BIM的国家以及我国工程建设行业引进BIM技术的年份描述正确的是()。
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
工程建设信息化,则依赖于建筑信息模型技术(BIM技术)所提供的各种基础数据。
注册消防工程师应当通过继续教育不断更新、补充、拓展知识和技能,完善知识结构,提高综合素质和专业技术水平。根据《注册消防工程师继续教育实施办法》,下列说法中错误的是(    )。
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

下列BIM相关要素中,属于BIM技术在建筑工程领域中应用的核心要素的是()。
为了实现工程造价的模拟计算和动态控制,可应用建筑信息建模(BIM)技术,在包含进度数据的建筑模型上加载费用数据而形成(  )模型。
指令ORS功能,可实现多个指令块的“与”运算。
BIM技术应该贯穿于建筑物的()过程。 (分数:2 分)
Mainly east 3 or 4 partly cloudy to overcast occasional rain()slowly south moderate or good.
()any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local quarantine officer must be notified immediately.
Should any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local Quarantine Officer must be()immediately.
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
BIM技术可贯穿工程建设的()全过程。
翻译:With Average or With Particular Average(WA or WPA)()
建筑工程BIM技术应用中,有关BIM是指()。
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
《专业技术人才知识更新工程实施方案》中明确规定:加强继续教育与专业技术人才使用政策的贯通。参加“工程”培养培训和学习情况作为个人专业技术经历和接受继续教育的重要记载。完善继续教育与()等人事管理制度的衔接
《专业技术人才知识更新工程实施方案》中明确规定:加强继续教育与专业技术人才使用政策的贯通。参加“工程”培养培训和学习情况作为个人专业技术经历和接受继续教育的重要记载。完善继续教育与()等人事管理制度的衔接。
广告位招租WX:84302438

免费的网站请分享给朋友吧