首页/ 题库 / [单选题]

某企业进行薪酬制度设计时,将各种职的答案

某企业进行薪酬制度设计时,将各种职位划分为若干种职位类型,找出各种职位中包含的共同“付酬因素”,然后把各“付酬因素”划分为若干等级,并对每一因素及其等级予以界定和说明,接着对每一“付酬因素”指派分数以及其在该因素各等级间的分配数值;最后,利用一张转换表将处于不同职级上的职位所得的“付酬因素”数值转换成具体的薪酬金额。该企业采用的薪酬制度设计方法是()

单选题
2021-07-17 20:39
A、<p>职位分类法</p>
B、<p>职位等级法</p>
C、<p>计点法</p>
D、<p>因素比较法</p>
查看答案

正确答案
C

试题解析

相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing

Goods are carried by several        of transport--on road or rail, by sea or air.

You can _____ some bottles of wine, or some chocolates, or a bunch of flowers.

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

某社会经济现象在一定时期内平均每期增长的绝对数量是(  )。[2010年中级真题]
Rent, economic(or pure economic rent) 经济租或纯经济租
A cabinet or space containing the controls or valves for the fixed firefighting system must be().
A cabinet or space containing the controls or valves for the fixed firefighting system must be().
Mainly east 3 or 4 partly cloudy to overcast occasional rain()slowly south moderate or good.
()any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local quarantine officer must be notified immediately.
Should any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local Quarantine Officer must be()immediately.
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
翻译:With Average or With Particular Average(WA or WPA)()
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
广告位招租WX:84302438

免费的网站请分享给朋友吧