首页/ 题库 / [单选题]江苏推进建筑工业化的现实意义不包括()的答案

江苏推进建筑工业化的现实意义不包括()

单选题
2022-01-11 12:03
A、有利于提高建设效率,服务快速城市化进程
B、有利于扩大建筑业劳动力需求
C、有利于促进节能减排,服务生态省建设
D、有利于产业结构提升,服务经济社会发展
查看答案

正确答案
B

试题解析

相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

建造师初始注册者,可自资格证书签发之日起()年内提出申请。逾期未申请者,需符合本专业继续教育的要求后方可申请初始注册。
注册建造师继续教育证书是其延续注册、变更注册的重要依据之一,注册一个专业的建造师有效期内应参加不少于()学时的继续教育。
采用弄虚作假等手段取得《注册建造师继续教育证书》的,一经发现,立即()。
Mainly east 3 or 4 partly cloudy to overcast occasional rain()slowly south moderate or good.
()any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local quarantine officer must be notified immediately.
Should any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local Quarantine Officer must be()immediately.
《注册建造师继续教育管理暂行办法》规定,注册建造师在每一注册有效期内从事以下工作并取得相应证明的,可充抵继续教育选修课部分学时。每一注册有效期内,充抵继续教育选修课学时累计不得超过()学时。
《注册建造师继续教育管理暂行办法》规定,必修课不包括的内容是()
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
《注册建造师管理规定》(建设部令第153号)规定,()对注册建造师的注册、执业和继续教育实施监督检查
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
翻译:With Average or With Particular Average(WA or WPA)()
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
广告位招租WX:84302438

免费的网站请分享给朋友吧