首页
题目
TAGS
首页
/
题库
/
[单选题]My brother Tim is()s的答案
搜答案
My brother Tim is()sports
单选题
2022-01-13 23:33
A、good for
B、good at
C、well at
D、well in
查看答案
正确答案
B
试题解析
标签:
CMS专题
专升本
英语
感兴趣题目
Project(71)is an uncertain event or condition that,if it occurs,has a positive or a negative effect on at least one project objective,such as time,cost,scope,or quality.
Project ______is an uncertain event or condition that,if it occurs,has a positive or a negative effect on at least one project objective,such as time,cost,scope,or quality.
● Project(71)is an uncertain event or condition that, if it occurs, has a positive or a negative effect on at least one project objective, such as time, cost, scope, or quality.(71)
Is this()longer or shorter?
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
The () is used for hauling in or letting out the wires or ropes.
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
A mark or place at which a vessel comes under obligatory entry,transit,or escort procedure is know as().
If you do not know the subject, you will not understand what is said or written, even if English is your mother () what is said or written.
Damage to cargo caused by fumes or vapors from liquids,gases,or solids is known as().
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing
1_____education is the instruction that occurs when the instructor and students are separated by distance or time,or both
Saving or reducing expenditure in business is ()
Saving or reducing expenditure in business is()
Saving or reducing expenditure in business is()
CASE OF DEATH OR SERIOUS INJURY TO A PERSON IN AN ACCIDENT OR SHIPPING DISASTER is().
I like sports and()my brother.
Where the contract is to insure the subject-matter at and from,or from one place to another or others,the policy is called a().
Damage to cargo caused by fumes or vapor from liquids,gases, or solids is known as().
Air circulation is caused or affected by().
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
During loading or discharging,where the delay is due to the Shipowner’s fault,or that of his servants or agents acting within their authority,the time actually delayed is to be()in calculating lay days.
Where a container,pallet or similar article of transport is used to consolidate goods,the number of packages or units enumerated in the bill of lading as packed in such article of transport()to be the number of packages or units in calculating the amount beyond which the carrier or the ship is not reliable.
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
My brother Tim is()sports
Traditionally, people gave Christmas gifts or money to their staff or servants on ()which is the day after Christmas.
翻译:With Average or With Particular Average(WA or WPA)()
My brother Tim is()sports
广告位招租WX:84302438
题库考试答案搜索网
免费的网站请分享给朋友吧