首页/ 题库 / [单选题]CVA分析法中归为较高优先级的库存产品应的答案

CVA分析法中归为较高优先级的库存产品应采取的管理措施是()。

单选题
2022-01-14 00:49
A、不许缺货
B、允许缺货
C、允许偶尔缺货
D、允许合理范围内缺货
查看答案

正确答案
B

试题解析

感兴趣题目
CVA分析法中归为最高优先级的库存产品应采取的管理措施是()。
CVA分析法中归为较低优先级的库存产品应采取的管理措施是()。
CVA分析法中归为最高优先级的库存产品应采取的管理措施是允许缺货。
可以在()阶段采用Make-or-buy决策分析。
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
A salvor may be()the whole or part of the payment due under Salvage Convention to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part or if the salvor has been guilty of fraud or other dishonest conduct.
The () is used for hauling in or letting out the wires or ropes.
Vessels must be()valid certificate of nationality or certificated of registry or license.
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
背景材料: 全盛公司是一家北京的家用电器制造商,年产各类家电20万台。公司拥有多种类型的产品,销往全国各地。公司对各种型号的产品实行统一的库存管理办法,经过一段时间出现了一些问题。例如,某些型号畅销,但是库存不足,丧失销售机会,而另外一些产品滞销,产生大量库存积压。为了解决这一问题,公司决定在库存管理中实行A、B、C分类管理法,针对不同产品制订不同库存策略。表三是公司产品库存管理分类的定义,表四 是某地区2005年销售情况的统计。 问题: 1.简述库存管理中ABC分析方法的定义。2.针对案例中给出的销售数据,请按照案例中给出的标准将不同的产品进行ABC分类。3.根据分类的结果,全盛公司应分别采取哪些库存管理的方法?并简述采取这种库存管理方法的理由是什么?1.库存管理中ABC分析是按照库存商品价值占总库存商品价值的比例,以及品种数量所占的比例,把库存商品分为不同的种类,实施不同的库存管理策略。一般是把商品价值占总库存价值比例高,但品种数量少的那部分商品定义为A类商品;把商品价值占总库存价值比例低,但品种数量占总库存品种数量比例高的那部分商品定义为C类商品;其余的定义为B类商品。7.
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

在CBMdisc中,优先级运算的逻辑运算是:()>AND>AND NOT>OR。
布尔逻辑算符AND/OR/NOT的优先顺序是( )
下列关于CVA库存管理法的说法中,不正确的是()。
CVA分析法中归为最高优先级的库存产品应采取的管理措施是允许缺货。
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
管理(或非浮动)价格Administered(or inflexible) prices
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
采用CVA管理法时,不允许缺货的是( )优先级商品。
采用CVA管理法时,不允许缺货的是( )优先级商品。
配制ORS液100ml应加入()
配制ORS液100mL应加入()
翻译:With Average or With Particular Average(WA or WPA)()
CVA分析法中归为较高优先级的库存产品应采取的管理措施是()。
CVA分析法中归为中等优先级的库存产品应采取的管理措施是()。
CVA分析法中归为较高优先级的库存产品应采取的管理措施是()。
广告位招租WX:84302438

免费的网站请分享给朋友吧