首页/ 题库 / [多选题]在使用概算指标法编制建筑工程概算时,如果的答案

在使用概算指标法编制建筑工程概算时,如果拟建工程在()等方面与概算指标相同或相近,就可以直接套用概算指标编制概算。

多选题
2022-02-21 17:57
A、建设地点
B、结构特征
C、建筑用途
D、使用年限
E、建筑面积
查看答案

正确答案
A | B | E

试题解析
当初步设计深度不够,不能准确地计算工程量,但工程设计采用的技术比较成熟而又有类似工程概算指标可以利用时,可以采用概算指标法编制工程概算。在使用概算指标法时,如果拟建工程在建设地点、结构特征、地质及自然条件、建筑面积等方面与概算指标相同或相近,就可直接套用概算指标编制概算。

感兴趣题目
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
A salvor may be()the whole or part of the payment due under Salvage Convention to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part or if the salvor has been guilty of fraud or other dishonest conduct.
The () is used for hauling in or letting out the wires or ropes.
Vessels must be()valid certificate of nationality or certificated of registry or license.
When loading or discharging dry mud or cement,crew members should use goggles and().
Effects which are dutiable or subject to prohibitions or restrictions should be declared in ().
()are liable to be stoten, pilfered or may damaged due to improper handing or stowage.
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
某建设项目只有一个单项工程且不编制建|考试|大|一级建造师|设项目总概算,则该单项工程的综合概算除了单位建筑工程概算、设备及安装工程概算外,还应包括( )概算。
相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

Rent, economic(or pure economic rent) 经济租或纯经济租
利用概算指标法编制建筑工程概算的主要步骤有:①计算单位面积或体积的人料机费用;②计算技术经济指标;③计算管理费、利润、规费、税金及概算单价;④计算单位工程概算价值。这些步骤正确的顺序是()。
什么叫ORS?如何配制?如何使用?
Mainly east 3 or 4 partly cloudy to overcast occasional rain()slowly south moderate or good.
()any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local quarantine officer must be notified immediately.
Should any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local Quarantine Officer must be()immediately.
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
翻译:With Average or With Particular Average(WA or WPA)()
使用概算指标法编制工程概算时,如果拟建工程结构特征与概算指标有局部差异,必须对概算指标进行调整后方可套用概算指标,调整方法包括()。
使用概算指标法编制工程概算时,如果拟建工程结构特征与概算指标有局部差异,必须对概算指标进行调整后方可套用概算指标,调整方法包括()。
在使用概算指标法编制建筑工程概算时,如果拟建工程在()等方面与概算指标相同或相近,就可以直接套用概算指标编制概算。
在使用概算指标法时,如果拟建工程的某些方面与概算指标相同或相近,就可直接套用概算指标编制概算,这些相同或相近的方面不包括()。
使用概算指标法编制工程概算时,如果拟建工程结构特征与概算指标有局部差异,必须对概算指标进行调整后方可套用概算指标,调整方法包括()。
使用概算指标法编制工程概算时,如果拟建工程结构特征与概算指标有局部差异,必须对概算指标进行调整后方可套用概算指标,调整方法包括()。
广告位招租WX:84302438

免费的网站请分享给朋友吧