首页/ 题库 / [单选题]He tried to hack()th的答案

He tried to hack()the banking system.

单选题
2022-02-24 01:32
A、to
B、on
C、into
D、for
查看答案

正确答案
C

试题解析

感兴趣题目
If the Charterer loads or discharges the vessel in a shorter time than is allowed to him by the lay days,he may be entitled to().
A vessel proceeding along the bank of a river or channel has the tendency to().
Goods should not be dispatched direct to the address of a bank or consigned to a bank without prior agreement on the part of that bank.
He tried to hack()the banking system.
If the officer on watch is in any doubt as to the pilot’s actions,or intentions,he should ().
()is entitled to enter into,with a shipper,any agreement,stipulation,condition,reservation or exception as to the responsibility and liability of the carrier or the ship for the loss of or damage to,or in connection with,the custody and care and handling of the goods prior to the loading on,and subsequent to the discharge from,the ship on which the goods are carried by sea.
The goal, which they are unlikely to live to see , is tocure, prevent or manage all diseasesin the next 80or so years.
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
A salvor may be()the whole or part of the payment due under Salvage Convention to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part or if the salvor has been guilty of fraud or other dishonest conduct.
Banks have no liability for any delay or loss caused by postal or telex failure.
The carrier is entitled to limit his liability to the stated sum per package or unit even if he failed to exercise due diligence to make the vessel().
when eduar tried open the coming attractions view. he got the following error message: incorrect data type for operator or @function: text expected. What did he do to cause this to happen?()
相关题目
Hard ( ) he tried, he was unable to meet the deadline for the term paper. 选项
No one knows a child’s( )towards fatness is inherited or due to the food he eats. 选项
For further information, you can call at the bank’s customer service hotline 12345 to extension 3124, or pay a visit to wwwbocusacom回答
Travellers, when ____________ the checks, have to sign the checks in the presence of the bank or service clerks
When the Pilot is embarked he or she ().
When the pilot is embarked he or she().
The writer decided to try the model he had chosen because he
The writer decided to try the model he had chosen because
In the absence of a custom or special contract to the contrary,the Shipowner is not bound to ()the consignees that he is ready to unload on arriving at the port of discharge.
If you learn to read the signs, you can tell whether what a person says is what he really means, or whether, like the man whose stomach does not move when he laughs, he is trying to deceive you.()
Where the contract is to insure the subject-matter at and from,or from one place to another or others,the policy is called a().
The mometn the author got down to the river bank he saw .
A seaman may have all or part of his wages deposited by allotment to a bank or savings institution. Which of the following is NOT a requirement for this type of allotment? ()
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
Either he or I ______to the airport.
During loading or discharging,where the delay is due to the Shipowner’s fault,or that of his servants or agents acting within their authority,the time actually delayed is to be()in calculating lay days.
A mortgagee does not acquire a right to the freight()he has taken actual or constructive possession of the ship.
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
A structure,usually made of stone,or cement pilings,which extends from the bank at approximately right angles to the current is called a().
广告位招租WX:84302438

免费的网站请分享给朋友吧