首页/ 题库 / [单选题]A continual worsenin的答案

A continual worsening of the list or trim indicates().

单选题
2022-02-24 18:09
A、negative GM
B、propressive flooding
C、structural failure
D、an immediate need to ballast
查看答案

正确答案
B

试题解析

感兴趣题目
A predictable result of a vessel nearing a bank or edge of a channel is that the().
Which of the valves listed should be used either in the fully opened or the fully closed position?()
Which of the following answers lists either a protocol or function that can be used by a host to dynamically learn its own IPv6 address?()
A vessel proceeding along the bank of a river or channel has the tendency to().
A continual worsening of the list or trim indicates().
A continual worsening of the list or trim indicates().
A declaration made by the Master before a PRC Consul,giving particulars regarding heavy weather or other incidents which may have caused damage to the vessel or cargo,through no fault of the vessel,her officers,or crew is a(n)().
It will be a relief over the death of a friend or a relative if the friend or relative dies from ______.
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
A salvor may be()the whole or part of the payment due under Salvage Convention to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part or if the salvor has been guilty of fraud or other dishonest conduct.
TRANSVERSE MOVEMENT OF CARGO,ESPECIALLY BULK,CAUSED BY ROLLING OR A HEAVY LIST defines().
During counterflooding to correct a severe list or trim aggravated by an off-center load,a ship suddenly takes a list or trim to the opposite side. You should().
相关题目

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

Personnel who are moving or handling material aboard ship should NOT follow which of the listed practices?()
Personnel who are moving or handling material aboard ship should NOT follow which of the listed practices?
Following a collision or accident,the Master of each vessel involved must render assistance to persons affected by the collision or accident().
The attitudes or emotion of a language user in choosing a word and the influence of these on the listener or reader’s interpretation of the word form ___ of a word.
If the cause of a sudden severe list or trim is negative initial stability,counter flooding into empty tanks may().
According to Hedge, a connotative meaning of a word refers to ‘the ___ or emotions of a language user in choosing a word and the influence of these on the listener’s or reader’s ___ of the word’
A rapid rise or fall of the barometer indicates().
When a vessel sees the other ahead or nearly ahead,by night she could see the masthead lights of the other in a line or nearly in a line or both side lights,()shall be deemed to exist.
Data items are added or deleted from the list only at the top of the______.
● Data items are added or deleted from the list only at the top of the (72) .(72)
The Urgency Signal()indicates that the station calling has a very urgent message to transmit concerning the safety of a ship or aircraft,or of some person on board or within sight.
If the state of the goods at the time they were handed over to the consignee has been the subjectof a joint survey or inspection by the parties,notice in writing()be given of loss or damage ascertained during such survey or inspection.
()means any person by whom or in whose name or on whose behalf a contract of carriage of goods by sea has been concluded with a carrier,or any person by whom or in whose name or on whose behalf the goods are actually delivered to the carrier in relation to the contract of carriage of goods by sea.
A seaman may have all or part of his wages deposited by allotment to a bank or savings institution. Which of the following is NOT a requirement for this type of allotment? ()
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
Where a container,pallet or similar article of transport is used to consolidate goods,the number of packages or units enumerated in the bill of lading as packed in such article of transport()to be the number of packages or units in calculating the amount beyond which the carrier or the ship is not reliable.
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
The Project Management Triangle is a model of the constraints of project management. These constraints have been listed scope (or quality), ( ), and cost
广告位招租WX:84302438

免费的网站请分享给朋友吧