首页/ 题库 / [单选题]If the survival craf的答案

If the survival craft is not loaded to full capacity,the personnel should be().

单选题
2022-02-28 19:59
A、loaded more on the port side forward
B、loaded equally on both sides with more forward
C、loaded equally on both sides with more aft
D、allowed to sit anywhere
查看答案

正确答案
C

试题解析

标签: 求生用语
相关题目
Which of the following is NOT mentioned as the factor to help the families of terror victims survive all hurts?
“To be or not to be----that is the question ” is taken from_______.
If the scavenge fire is of a more major nature, if there is a risk of the fire extending or if the scavenge trunk is adjacent to the crankcase with risk of a hot spot developing it sometimes becomes necessary to ()the engine.
Does it always matter if the “real world” is not being practiced in the classroom? Why or why not?
In ballasting to survival draft,while in transit,due to extreme wind and wave loads,thrusters or propulsion,if available,should be used to().
The drive motor will have a brake arranged to fail-safe, ieit will () the load if power fails or machine is stopped.
The drive motor will have a brake arranged to fail-safe, i√eit will () the load if power fails or machine is stopped.
The purpose for the bag or box on top of some survival craft is to().
During loading or discharging,where the delay is due to the Shipowner’s fault,or that of his servants or agents acting within their authority,the time actually delayed is to be()in calculating lay days.
If the engine of a survival craft does not start,check to see().
If the place named for the loading is simply a port or dock,notice of readiness may be given as soon as the ship arrives()although she is not in the particular spot where the loading is to take place.
When a survival craft drill is held,the person in charge must insure that().
If the Charterer loads or discharges the vessel in a shorter time than is allowed to him by the lay days,he may be entitled to().
An “on-load” release system on a survival craft means the cable can be released().
Any friction fit, tightness or adhesion of the part of any load being lifted should be broken by wedge or tapping and not by increasing the load on the applianceAccording to this sentence, ()
If a diesel engine starts firing, but is unable to come up normal speed, either without load or even under a small load, the cause may be ()
A notice of readiness is not valid unless it indicates that the vessel is ready to load or discharge as the case may be,at the time()it is given.
If the Shipowner fails to give the Charterer the notice of readiness to load,and delay in commencing to load is thereby caused,the Charterer will (),as he is not bound to look out for the ship.
Which one of the followings is not required on survival crafts?()
If the survival craft is not loaded to full capacity,the personnel should be().
广告位招租WX:84302438

免费的网站请分享给朋友吧