首页/ 题库 / [问答题]请叙述网络管理体系结构概念并给出常见的网的答案

请叙述网络管理体系结构概念并给出常见的网络管理体系结构。

问答题
2022-03-05 21:24
查看答案

正确答案

网络管理体系结构是指网络管理系统、网络管理代理的组织形式。
常见的网络管理体系结构是集中式体系结构、层式体系结构、分布式体系结构


试题解析

相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

A cabinet or space containing the controls or valves for the fixed firefighting system must be().
A cabinet or space containing the controls or valves for the fixed firefighting system must be().
CASE OF DEATH OR SERIOUS INJURY TO A PERSON IN AN ACCIDENT OR SHIPPING DISASTER is().
Mainly east 3 or 4 partly cloudy to overcast occasional rain()slowly south moderate or good.
()any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local quarantine officer must be notified immediately.
Should any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local Quarantine Officer must be()immediately.
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
管理(或非浮动)价格Administered(or inflexible) prices
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
翻译:With Average or With Particular Average(WA or WPA)()
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
在某地搬迁网络工程实施中。 (1)在网络割接之前,网络规划优化工程师需要收集和采集哪些原有网络的内容? (2)从网络规划优化的角度,在网络搬迁工程的网络规划中,应该注意哪些方面的内容,才能保证网络搬迁后的网络质量?
某地GSM网络基站搬迁实施后发现各种覆盖问题,引起客户不满。作为网络规划工程师,请简述在搬迁工程中, (1)在网络割接之前,网络规划优化工程师需要收集和采集哪些原有网络的内容? (2)从网络规划优化的角度,在网络搬迁工程的网络规划中,应该注意哪些方面的内容,才能保证网络搬迁后的网络质量?
广告位招租WX:84302438

免费的网站请分享给朋友吧