首页
题目
TAGS
首页
/
题库
/
[单选题]The plan has set off的答案
搜答案
The plan has set off() controversy.
单选题
2022-03-26 00:53
A、a storm of
B、a stone of
C、a rock of
D、a blow of
查看答案
正确答案
A
试题解析
标签:
成人本科学位英语
CMS专题
感兴趣题目
The plan has set off() controversy.
●The project budget has been finalized.Additional work has been discovered that was not planned for in the budget or project scope.(74) could provide the fund to cover the newly discovered work item.
The project budget has been finalized.Additional work has been discovered that was not planned for in the budget or project scope. ( )could provide the fund to cover the newly discovered work item.
The project budget has been finalized.Additional work has been discovered that was not planned for in the budget or project scope. ( )could provide the fund to cover the newly discovered work item.
If necessary to avoid collision or allow more time to()the situation,a vessel shall slacken her speed or take all way off by stopping or reversing her means of propulsion.
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
A salvor may be()the whole or part of the payment due under Salvage Convention to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part or if the salvor has been guilty of fraud or other dishonest conduct.
The Shipowner must not stow goods on deck()there is a trade usage to that effect or the Charterer has given his express or implied consent.
Motor transport has the biggest market share in the paragraph. Is it true or not ()
The schedule management plan is a component of the project management plan. The Schedule management plan maybe formal or informal, highly detailed or broadly framed, based upon the()of the project, and includes appropriate control thresholds.
The schedule management plan is a component of the project management plan The schedule management plan may be formal or informal, highly detailed or broadly framed, based upon the()of the project, and includes appropriate control thresholds.
相关题目
It()(already find) that the moon has no life or vegetation
The manager or his assistant ______ planning to go
Goods of an inflammable,explosive or dangerous nature to the shipment whereof the carrier,master or agent of the carrier,has not consented,with knowledge of their nature and character,may at any time before discharge,()at any place or destroyed or rendered innocuous by the carrier without compensation.
When planning the loading or discharging of a VLCC (100,000 DWT+) what is the most important consideration?()
The engine has one or two group of fuel pumps, depending upon ().
The () is not properly set thus causing either advanced or retarded firing.
The Urgency Signal()indicates that the station calling has a very urgent message to transmit concerning the safety of a ship or aircraft,or of some person on board or within sight.
If the state of the goods at the time they were handed over to the consignee has been the subjectof a joint survey or inspection by the parties,notice in writing()be given of loss or damage ascertained during such survey or inspection.
()means any person by whom or in whose name or on whose behalf a contract of carriage of goods by sea has been concluded with a carrier,or any person by whom or in whose name or on whose behalf the goods are actually delivered to the carrier in relation to the contract of carriage of goods by sea.
成人高等教育本科生只能在毕业()个月内申请学士学位。
符合条件的开放教育本科(专科起点)学生,可在规定时间内向合作高校申请成人高等教育学士学位。
本科毕业生授予学士学位要满足的英语成绩条件以下正确的是()。
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
Keeping the draft at or below the load line mark will insure that the vessel has adequate().
In advanced PC bus or local bus,(73)has the fastest data throughput.
A vessel proceeding along the bank of a river or channel has the tendency to().
Off hire is when a vessel breaks down,strands,or has any damage that prevents the working of cargo or delays the sailing of the vessel.Under which of the following charter parties is off hire most likely to be mentioned?().
Off hire is when a vessel breaks down,strands,or has any damage that prevents the working of cargo or delays the sailing of the vessel.Under which of the following charter parties is off hire mostlikely to be mentioned?().
The () is not properly set thus causing either advanced or retarded firing.
广告位招租WX:84302438
题库考试答案搜索网
免费的网站请分享给朋友吧