首页/ 题库 / [问答题]请分别说明 的答案

请分别说明 A/D D/A 转换器的作用,说明它们的主要技术指标,并进一步说明在什么情况下必须在 A/D 转换器前加采样·保持电路。

问答题
2022-04-02 13:05
查看答案

正确答案

A/DD/A转换器分别能够将模拟量转换成数字量与数字量转换成模拟量,通过这样的转换电路,能够将模拟系统和数字系统联系起来,实现对模拟系统的检测、监视和控制。A/DD/A转换器的主要技术指标分别为转换进度和转换时间。因为A/D转换需要一定的时间,当在这段时间里,被转换的信号发生改变,将使转换结果不准确,必须将要转换时刻的模拟量保持下来,确保转换期间该值的稳定。


试题解析

相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing

Goods are carried by several        of transport--on road or rail, by sea or air.

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

逻辑表达式 1>0 and Not 2<7 or 2>6的值为
A cabinet or space containing the controls or valves for the fixed firefighting system must be().
逻辑表达式 1>0 and Not 2<7 or 2>6的值为
布尔逻辑算符AND/OR/NOT的优先顺序是( )
Mainly east 3 or 4 partly cloudy to overcast occasional rain()slowly south moderate or good.
()any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local quarantine officer must be notified immediately.
Should any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local Quarantine Officer must be()immediately.
已知A=40;B=30;C=100;D=50,逻辑“与”运算符为and,“或”运算符为or,“非”运算符为not。计算表达式(A>B+20)or(B+60<>
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
翻译:With Average or With Particular Average(WA or WPA)()
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
广告位招租WX:84302438

免费的网站请分享给朋友吧