首页/ 题库 / [单选题]临时用地的使用期的答案

临时用地的使用期限一般不得超过(     )年。

单选题
2022-04-02 17:16
A、<span style=" FONT-SIZE: 10.5pt;">1</span>
B、<span style=" FONT-SIZE: 10.5pt;">2</span>
C、<span style=" FONT-SIZE: 10.5pt;">3</span>
D、<span style=" FONT-SIZE: 10.5pt;">4</span>
查看答案

正确答案
B

试题解析

相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

Rent, economic(or pure economic rent) 经济租或纯经济租
A cabinet or space containing the controls or valves for the fixed firefighting system must be().
福建水利电力职业技术学院正式更名为福建水力电力职业技术学院的时间是()
Mainly east 3 or 4 partly cloudy to overcast occasional rain()slowly south moderate or good.
()any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local quarantine officer must be notified immediately.
Should any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local Quarantine Officer must be()immediately.
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
管理(或非浮动)价格Administered(or inflexible) prices
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
翻译:With Average or With Particular Average(WA or WPA)()
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
《专业技术人才知识更新工程实施方案》中明确规定:加强继续教育与专业技术人才使用政策的贯通。参加“工程”培养培训和学习情况作为个人专业技术经历和接受继续教育的重要记载。完善继续教育与()等人事管理制度的衔接
《专业技术人才知识更新工程实施方案》中明确规定:加强继续教育与专业技术人才使用政策的贯通。参加“工程”培养培训和学习情况作为个人专业技术经历和接受继续教育的重要记载。完善继续教育与()等人事管理制度的衔接。
广告位招租WX:84302438

免费的网站请分享给朋友吧