首页/ 题库 / [问答题]试述单位工程施工组织设计技术经济分析指标的答案

试述单位工程施工组织设计技术经济分析指标体系。

问答题
2022-04-02 18:00
查看答案

正确答案
总工期指标;
质量指标优良品率;(1分)
劳动指标;(1分)
主要材料节约指标;(1分)
机械使用指标;(1分)
降低成本指标。(1分)

试题解析

感兴趣题目
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
A salvor may be()the whole or part of the payment due under Salvage Convention to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part or if the salvor has been guilty of fraud or other dishonest conduct.
The () is used for hauling in or letting out the wires or ropes.
Vessels must be()valid certificate of nationality or certificated of registry or license.
When loading or discharging dry mud or cement,crew members should use goggles and().
Effects which are dutiable or subject to prohibitions or restrictions should be declared in ().
The()may examine or re-examine the goods or take samples from them straightaway in the absence of the consignee or the consignor whenever it considers this necessary.
()are liable to be stoten, pilfered or may damaged due to improper handing or stowage.
Banks have no liability for any delay or loss caused by postal or telex failure.
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
某施工单位负责南方在建石油化工装置的管道安装工程、设备安装工程的施工。由于中标时间距工程的开工时间很短,所以该施工单位在工程开工后,才完成施工组织设计的编制工作。施工过程中,建设单位对该施工单位的施工质量很满意,将装置内的保温工程、防火工程也交由该施工单位进行施工,签订了施工合同。该施工单位认为自己已经编制了施工组织设计,且保温工程、防火工程只是附属工程,所以不需要再编制施工组织设计。后来在建设单位的要求下,该施工单位的工程项目部编制了增加工程的施工组织设计,由项目总工程师审批后下发执行。 问题:该施工单位在工程开工后才编制施工组织设计的做法是否正确?为什么?
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

根据《建设工程勘察设计管理条例》,建设工程勘察设计单位的义务是()。I•建设工程勘察设计单位应当在建设工程施工前,向施工单位和监理单位说明建设工程勘察设计意图;II.建设工程勘察设计单位应当在建设工程施工前,向施工单位和监理单位解释建设工程勘察设计文件;Ⅲ.建设工程勘察设计单位应当及时解决施工中出现的勘察设计问题
Mainly east 3 or 4 partly cloudy to overcast occasional rain()slowly south moderate or good.
工程项目部在施工前应编制施工组织设计,施工组织设计应针对工程特点、施工工艺制定安全()措施。
()any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local quarantine officer must be notified immediately.
Should any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local Quarantine Officer must be()immediately.
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
翻译:With Average or With Particular Average(WA or WPA)()
试述单位工程施工组织设计的编制程序?
单位工程施工组织设计是以单位工程为主要对象编制的施工组织设计,对单位工程施工过程起指导和制约作用。
根据《建设工程勘察设计管理条例》,建设工程勘察设计单位的义务是( )。I•建设工程勘察设计单位应当在建设工程施工前,向施工单位和监理单位说明建设工程勘察设计意图;II.建设工程勘察设计单位应当在建设工程施工前,向施工单位和监理单位解释建设工程勘察设计文件;Ⅲ.建设工程勘察设计单位应当及时解决施工中出现的勘察设计问题
试述单位工程施工组织设计技术经济分析指标体系。
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
广告位招租WX:84302438

免费的网站请分享给朋友吧