为何要进行建设项目不确定性分析?主要方法有哪些?

问答题
2022-04-02 18:14
查看答案

正确答案

试题解析
  在可行性研究或项目评估的经济分析中,都是以确定的数据为计算前提。事实上项目建设过程中存在着许多随时间、地点、条件改变而变化的不确定因素(如物价变动、投资变化、工艺技术变化、生产能力变化、新产品和新材料的应用、政策变化等)。这些不确定因素构成经济分析中的不确定性。为此,还必须研究分析各种具体不确定因素对建设项目经济效益的影响。计算出产晶价格、生产规模、成本、贴现率、投资、投产期等因素变化时项目盈利的变化,估算出对经济考核指标有重大影响的敏感因素及其变化范围、在此范围内的概率,从而为项目的决策提供更为可靠的依据。这种以不确定因素对建设项目经济效益影响为内容的计算和分析称为建设项目不确定性分析。 不确定性分析的方法很多,用得较为普遍的有盈亏平衡分析、敏感性分析和概率分析三种。

相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

A cabinet or space containing the controls or valves for the fixed firefighting system must be().
A cabinet or space containing the controls or valves for the fixed firefighting system must be().
CASE OF DEATH OR SERIOUS INJURY TO A PERSON IN AN ACCIDENT OR SHIPPING DISASTER is().
Mainly east 3 or 4 partly cloudy to overcast occasional rain()slowly south moderate or good.
病例对照研究进行统计性推断时不匹配分层资料总的OR值计算公式是
()any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local quarantine officer must be notified immediately.
Should any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local Quarantine Officer must be()immediately.
Damage to cargo caused by fumes or vapor from liquids,gases, or solids is known as().
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
翻译:With Average or With Particular Average(WA or WPA)()
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
广告位招租WX:84302438

免费的网站请分享给朋友吧