什么是施工项目?其特征有哪些?

什么是施工项目?其特征有哪些?

问答题
2022-04-02 18:15
查看答案

正确答案

试题解析
  施工项目是建筑施工承包企业对一项或一群建筑产品的施工过程及最终成果,也就是建筑施工企业的生产对象。它是一个建设项目的施工,也可能是其中的一个单项工程或单位工程的施工。因此,施工项目具有三个特征: (1)它是建设项目或其中的单项工程或单位工程的施工任务。 (2)它作为一个管理整体,是以建筑施工企业为管理主体的。 (3)该任务的范围是由工程承包合同界定的。但从项目的特征来看,只有单位工程、单项工程和建设项目整体的施工任务,才称得上施工项目。因为单位工程是建筑施工企业的最小单位的最终产品。分部、分项工程只是施工项目的组成部分,不是完整的产品,因此不能称作“施工项目”。

相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing

Goods are carried by several        of transport--on road or rail, by sea or air.

You can _____ some bottles of wine, or some chocolates, or a bunch of flowers.

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

2002年新配方口服补液盐(ORS)溶液的张力是

A cabinet or space containing the controls or valves for the fixed firefighting system must be().
什么叫ORS?如何配制?如何使用?
一项关于吸烟与肺癌关系的病例对照研究,研究结果表明OR为4.0,其意义是()
Mainly east 3 or 4 partly cloudy to overcast occasional rain()slowly south moderate or good.
()any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local quarantine officer must be notified immediately.
Should any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local Quarantine Officer must be()immediately.
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
翻译:With Average or With Particular Average(WA or WPA)()
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
广告位招租WX:84302438

免费的网站请分享给朋友吧