首页/ 题库 / [单选题]根据《标准施工招标文件》“投标人须知前附的答案

根据《标准施工招标文件》“投标人须知前附表”的目是( )。

单选题
2022-04-02 18:20
A、列明“通用合同条款”
B、明确“投称人须知“正文中的未尽事宜
C、明确“投称人须知“的修改内容
D、判明评标的方法和因素
查看答案

正确答案
B

试题解析

感兴趣题目
Vessels must be()valid certificate of nationality or certificated of registry or license.
When loading or discharging dry mud or cement,crew members should use goggles and().
Effects which are dutiable or subject to prohibitions or restrictions should be declared in ().
The()may examine or re-examine the goods or take samples from them straightaway in the absence of the consignee or the consignor whenever it considers this necessary.
()are liable to be stoten, pilfered or may damaged due to improper handing or stowage.
在建设工程施工招标文件中,与合同条款内容有关的是()。
Banks have no liability for any delay or loss caused by postal or telex failure.
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
根据《工程建设项目施工招标投标办法》、《标准施工招标资格预审文件》规定,工程建设项目资格预审公告内容不包括()。
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
根据《标准施工招标文件》中“通用合同条款”的规定,控制合同工程进度的依据是()。
某工程建设单位采用公开招标方式选择施工单位,并编制了招标文件和标底价格,北方建筑公司根据招标文件要求,编制了投标文件,中标后长城建筑公司与项目经理张某签订承包合同,实行项目经理负责制的项目管理方式,施工时,因建设单位拆迁工作比合同规定推迟5d完成,项目经理部为确保按照原合同工期完工,重新编制了施工进度计划,同时加强施工现场安全管理工作。经过项目经理部全体员工的共同努力,工程比原合同工程只晚3d完工。项目经理在施工过程中进行成本管理的工作流程主要有哪些?
相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing
根据《公路工程标准施工招标文件》(2009年版)合同文件范本,关于计量支付管理的说法,错误的有()

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

《〈标准施工招标资格预审文件〉和〈标准施工招标文件〉试行规定》是(  )联合九部委制定的建设工程施工招标投标领域的规章。
根据《水利工程建设项目招标投标管理规定》以及《工程建设项目施工招标投标办法》,招标文件有()情况的,招标人不予受理。
根据《标准施工招标资格预审文件》及《标准施工招标文件》的规定,合同附件应包括()。
Mainly east 3 or 4 partly cloudy to overcast occasional rain()slowly south moderate or good.
()any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local quarantine officer must be notified immediately.
Should any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local Quarantine Officer must be()immediately.
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
翻译:With Average or With Particular Average(WA or WPA)()
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
A salvor may be()the whole or part of the payment due under Salvage Convention to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part or if the salvor has been guilty of fraud or other dishonest conduct.
The () is used for hauling in or letting out the wires or ropes.
广告位招租WX:84302438

免费的网站请分享给朋友吧