首页/ 题库 / [单选题]On point-to-point ne的答案

On point-to-point networks, OSPF hello packets are addressed to which address()。

单选题
2022-05-09 14:24
A、127.0.0.1
B、172.16.0.1
C、192.168.0.5
D、223.0.0.1
E、224.0.0.5
F、254.255.255.255
查看答案

正确答案
E

试题解析

感兴趣题目
● Project(71)is an uncertain event or condition that, if it occurs, has a positive or a negative effect on at least one project objective, such as time, cost, scope, or quality.(71)
()is entitled to enter into,with a shipper,any agreement,stipulation,condition,reservation or exception as to the responsibility and liability of the carrier or the ship for the loss of or damage to,or in connection with,the custody and care and handling of the goods prior to the loading on,and subsequent to the discharge from,the ship on which the goods are carried by sea.
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
A salvor may be()the whole or part of the payment due under Salvage Convention to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part or if the salvor has been guilty of fraud or other dishonest conduct.
The () is used for hauling in or letting out the wires or ropes.
Vessels must be()valid certificate of nationality or certificated of registry or license.
Why are many people on restricted or reduced diets?
The Shipowner must not stow goods on deck()there is a trade usage to that effect or the Charterer has given his express or implied consent.
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
F1系列PLC—OR指令表示()。
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing

Goods are carried by several        of transport--on road or rail, by sea or air.

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

_________ in a person’s speech or writing usually ranges on a continuum from casual or colloquial to formal or polite according to the type of communicative situation.
35儿科常用的 ORS溶液内不含:()
Document outputs are produced on(75) , devices that produce text or images on paper.
Document outputs are produced on(71), devices that produce text or images on paper.
The Urgency Signal()indicates that the station calling has a very urgent message to transmit concerning the safety of a ship or aircraft,or of some person on board or within sight.
Would you rather come on Friday or Saturday?()
()means any person by whom or in whose name or on whose behalf a contract of carriage of goods by sea has been concluded with a carrier,or any person by whom or in whose name or on whose behalf the goods are actually delivered to the carrier in relation to the contract of carriage of goods by sea.
31. --- Can you come on Monday or Tuesday?
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
Traditionally, people gave Christmas gifts or money to their staff or servants on ()which is the day after Christmas.
翻译:With Average or With Particular Average(WA or WPA)()
RULE III. EXTINGUISHING FIRE ON SHIPBOARD: Damage done to a ship and cargo, or either of them, by water or otherwise, including damage by beaching or scuttling a burning ship, in extinguishing a fire on board the ship, shall be made good as general average; except that no compensation shall be made for damage by smoke or heat however caused. 根据以上条款,不能列入共同海损的是()。
Project(71)is an uncertain event or condition that,if it occurs,has a positive or a negative effect on at least one project objective,such as time,cost,scope,or quality.
Project ______is an uncertain event or condition that,if it occurs,has a positive or a negative effect on at least one project objective,such as time,cost,scope,or quality.
广告位招租WX:84302438

免费的网站请分享给朋友吧