首页/ 题库 / [多选题]你正在开发一个使用 SqlConnect的答案

你正在开发一个使用 SqlConnection 对象连接到 Microsoft SQL Server 数据库的应用。你的连接对象正在使用连接池。当连接池满的时候请求将被排队或者某些连接请求可能被拒绝。你需要确保应用能够尽早的释放连接给连接池。因此,为了减少连接被拒的可能性,你应该从下面那三个方法着手解决?()

多选题
2022-05-09 15:00
A、确保完成执行后调用每个连接对象的Close方法。
B、确保完成执行后每个连接对象保持打开状态。
C、在连接字符串内增加Max Pool Size的值。
D、在连接字符串内增加Min Pool Size的值。
E、在连接字符串内增加Connection Lifetime的值。
F、增加SqlConnection对象的ConnectionTimeout属性的值。
查看答案

正确答案
A | C | F

试题解析

相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

A cabinet or space containing the controls or valves for the fixed firefighting system must be().
A cabinet or space containing the controls or valves for the fixed firefighting system must be().
世界卫生组织推荐使用的口服补液盐(ORS)溶液的张力为()。
什么叫ORS?如何配制?如何使用?
CASE OF DEATH OR SERIOUS INJURY TO A PERSON IN AN ACCIDENT OR SHIPPING DISASTER is().
Mainly east 3 or 4 partly cloudy to overcast occasional rain()slowly south moderate or good.
你正在开发一个 Web 应用。依据用户身份的不同,你在代码中限制了某些用户对某些页面的访问。你需要配置 IIS,让你的 Web 应用支持 Windows 身份认证,你应该如何做?()
()any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local quarantine officer must be notified immediately.
Should any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local Quarantine Officer must be()immediately.
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
翻译:With Average or With Particular Average(WA or WPA)()
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
广告位招租WX:84302438

免费的网站请分享给朋友吧