首页/ 题库 / [多选题]预应力筋张拉或放张时,( )。的答案

预应力筋张拉或放张时,( )。

多选题
2021-07-17 22:10
A、混凝土强度应符合设计要求
B、根据试验确定
C、无设计要求时,不应低于设计强度标准值的75%
D、无法确定
查看答案

正确答案
AC

试题解析

感兴趣题目
混凝土结构工程施工质量验收规范2011版(GB50204-2002):预应力筋张拉或放张时,混凝土强度应符合设计要求当设计无具体要求时,不应低于设计的混凝土立方体抗压强度标准值的()
检验结构或构件在拆模、出池、预应力筋张拉或放张、出厂、吊装等期间混凝土强度时,其试件应采用()的成型方法和养护条件制作。
预应力筋的张拉力、张拉或放张顺序及张拉工艺应符合设计及施工技术方案的要求,当施工需要超张拉时,最大张拉应力不应大于国家现行标准()的规定。
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
A salvor may be()the whole or part of the payment due under Salvage Convention to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part or if the salvor has been guilty of fraud or other dishonest conduct.
The () is used for hauling in or letting out the wires or ropes.
Vessels must be()valid certificate of nationality or certificated of registry or license.
When loading or discharging dry mud or cement,crew members should use goggles and().
Effects which are dutiable or subject to prohibitions or restrictions should be declared in ().
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

预应力筋张拉或放张时,( )。
预应力筋张拉与放张应检查什么?
预应力筋张拉与放张应检查什么?
()any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local quarantine officer must be notified immediately.
Should any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local Quarantine Officer must be()immediately.
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
翻译:With Average or With Particular Average(WA or WPA)()
后张法预应力筋预张拉或初张拉时,混凝土强度必须符合设计要求。当设计无要求时,初张拉时混凝土强度应达到设计强度的()。后张法预应力筋终张拉或先张法预应力筋放张时,混凝土强度等级、龄期和弹性模量必须符合设计要求。
预应力筋张拉或放张时,混凝土强度应符合设计要求,当设计无具体要求时,至少不应低于设计混凝土立方体抗压强度标准值的()。
预应力筋张拉或放张时,混凝土强度应符合设计要求,当设计无具体要求时,至少不应低于设计混凝土立方体抗压强度标准值的()%。
预应力筋张拉或放张时,混凝土强度应符合设计要求,当设计无具体要求时,至少不应低于设计混凝土立方体抗压强度标准值的()。
预应力筋张拉或放张时,混凝土强度应符合设计要求;当设计无具体要求时,不应低于设计的混凝土立方体抗压强度标准值的()
当设计无规定时,张拉或放张时混凝土强度均不应小于设计强度()%
当设计无规定时,张拉或放张时混凝土强度均不应小于设计强度()%
广告位招租WX:84302438

免费的网站请分享给朋友吧