首页/ 题库 / [单选题]建筑工程实行招标发包的,发包单位应当将建的答案

建筑工程实行招标发包的,发包单位应当将建筑工程发包给依法中标的承包单位。建筑工程实行直接发包的,发包单位应当将建筑工程发包给具有()的承包单位。

单选题
2022-06-17 04:41
A、相应资质条件
B、雄厚经济实力
C、良好社会信誉
D、社会评价好
查看答案

正确答案
A

试题解析

相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

Rent, economic(or pure economic rent) 经济租或纯经济租
A cabinet or space containing the controls or valves for the fixed firefighting system must be().
A cabinet or space containing the controls or valves for the fixed firefighting system must be().
取得安全工程、工程经济类大学专科学历,从事安全生产相关业务满()年的中华人民共和国公民可申请参加注册安全工程师执业资格考试。
从事建筑工程活动的人员,要通过国家任职资格考试、考核,由( )注册并颁发资格证书
我国注册建筑师级别设置分为一级注册建筑师和二级注册建筑师。其中二级注册建筑师注册标准不低于目前发达国家现行注册标准。()
Mainly east 3 or 4 partly cloudy to overcast occasional rain()slowly south moderate or good.
()any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local quarantine officer must be notified immediately.
Should any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local Quarantine Officer must be()immediately.
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
翻译:With Average or With Particular Average(WA or WPA)()
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
广告位招租WX:84302438

免费的网站请分享给朋友吧