The ()process ascertains which risks have the potential of affecting the project and documenting the risks' characteristics.

All accidents and damage to ship,equipment or personnel,must be()in the vessel deck log.
Managing risk and documenting them is very important in project planning process. You are in the process of defining key risks, including constraints and assumptions, and planned responses and contingencies. These details will be included in the( )
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
Consonant sounds can be either ()or(),while all vowel sounds are ().
There are strategies typically deal with threats or risk that may have negative impacts on project objectives if they occur, some other strategies are suggested to deal with risks with potentially positive impacts. ()is a risk response strategy that may be adopted for either threats or opportunities.
Safety-management objectives of the Company should establish safeguards () all identified risks.
Risks other()All Risks and War Risk can be covered if the extra pr- enium should be borne by the buyer.
●The Systems Development Life Cycle (SDLC) is a process of creating or altering information systems, and the models and methodologies that people use to develop these systems. Sequential SDLC models, such as (72), focus on complete and correct planning to guide large projects and risks to successful and predictable results.
() system is arranged to ensure that water can be drawn from any tank or the sea and discharged to any other tank or the sea as required to trim the vessel.
Should it appear that war or blockade would prevent the vessel from safely reaching the port of destination and / or discharging the goods thereat,the Carrier().
相关题目

—But in your case, we strongly recommend War Risks and WPA.

                     

I am ________ the risks involved in the project, but I am willing to take the risks.( )
English vowels can be voiced or voiceless.
From a practical________, how can you reduce production costs and at the same time minimize the risks involved
All people, whether they be rich or poor, strong or weak, privileged or deprived,are interdependent, and _______ the common task of seeking to achieve mankinds full potential
Unless otherwise _____________, we wish to arrange to take out insurance on the shipment against All Risks and War Risk

()involves comparing actual or planned project practices to those of other projects to generate ideas for improvement and to provide a basis by which to measure performance. These other projects can be within the performing organization or outside of it, and can be within the same or in another application area.

●Managing risk and documenting them is very important in project planning process. You are in the process of defining key risks, including constraints and assumptions, and planned responses and contingencies. These details will be included in the (73).
All fines and expenses from insufficiency and inadequacy of packing or marks shall be borne by ().
The intention of the()is to schedule, organize and control all activities to achieve the project goal eventually.no matter how difficult it is and what kind of risks are there.

The strategies for handling risk comprise of two main types: negative risks, and positive risks. The goal ofthe plan is to minimize threats and maximize opportunities. When dealing with negative risks, there are three main response strategies(),rransfer ,Mitigate.

The strategies for handling risk comprise of two main types:negative risks, and positive risks.The goal of the plan is to minimize threats and maximize opportunities.When dealing with negative risks,there are three main response strategies( ),Transfer ,Mitigate .
The strategies for handling risk comprise of two main types: negative risks, and positive risks. The goal Of the plan is to minimize threats and maximize opportunities. When dealing with negative risks,there are three main response strategies______,Transfer, Mitigate.
Misalignment of the drive shaft and propeller shaft flanges can be detected by using a dial indicator or ().
Misalignment of the drive shaft and propeller shaft flanges can be detected by using a dial indicator or ()
—When can I call on you, afternoon or evening?
—________. I’ll be at home all the time.
()assesses the priority of identified risks using their probability of occurring, the corresponding impact on project objectives if the risks do occur, as well as other factors such as the time frame and risk tolerance of the project constraints of cost, schedule, scope, and quality.
●(71)assesses the priority of identified risks using their probability of occurring, the corresponding impact on project objectives if the risks do occur, as well as other factors such as the time frame. and risk tolerance of the project constraints of cost, schedule, scope, and quality.(71)