首页/ 题库 / [多选题]善意取得的构成要件是:()的答案

善意取得的构成要件是:()

多选题
2023-03-10 03:58
A、标的物既可以是动产,也可以是不动产。
B、让与人须为无权处分动产的所有人。
C、受让人须基于交易行为取得动产的占有且须支付对价。
D、受让人受让财产时须为善意。
E、受让人受让财产必须始终出于善意。
查看答案

正确答案
B | C | D

试题解析
A不正确,因为善意取得的标的物必须为动产,不动产转让适于登记转让制度,也就不存在善意取得。E不正确,因为,善意取得只要受让人在受让财产时出于善意即可成立善意取得的主观要件。

相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

OR是串联常开接点指令,把原来保存在结果寄存器中的逻辑操作结果与指定是继电器内容相“与”,并把这一逻辑操作结果存入结果寄存器。
由基本逻辑运算(AAND(NOT)B)OR((NOTA)ANDB)构成的复合运算称为()运算。
简述善意取得制度的概念、构成要件与法律效果。
法学学科框架的传统构成主要包括理论法学、历史法学、()及应用法学几大板块。理论法学又称()是法学研究的基础,应用法学主要研究国内和国际的现行法律及其制定、解释和应用,是法学体系的主要部分。
()any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local quarantine officer must be notified immediately.
Should any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local Quarantine Officer must be()immediately.
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
法学学科框架的传统构成主要包括理论法学、()、()及应用法学几大板块。理论法学又称(),是法学研究的基础;应用法学主要研究国内和国际的现行法律及其()、()和应用,是法学体系的主要部分。
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
翻译:With Average or With Particular Average(WA or WPA)()
试说明OR DX,-35[BX][DI]指令中源操作数和目的操作数使用的寻址方式。
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
A salvor may be()the whole or part of the payment due under Salvage Convention to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part or if the salvor has been guilty of fraud or other dishonest conduct.
The () is used for hauling in or letting out the wires or ropes.
广告位招租WX:84302438

免费的网站请分享给朋友吧