首页/ 题库 / [单选题]土石坝综合机械化施工龙头机械一般指( )的答案

土石坝综合机械化施工龙头机械一般指( )。

单选题
2021-07-17 23:20
A、坝面作业机械
B、削坡机械
C、运输机械
D、挖掘机械
查看答案

正确答案
D

试题解析

相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

A cabinet or space containing the controls or valves for the fixed firefighting system must be().
在水利水电工程中,高土石坝一般要用()计算坝体坝基及岸坡接头在填土自重及其他荷载作用下的填土应力应变,为坝体稳定分析和与土坝连接建筑物设计提供依据。
Mainly east 3 or 4 partly cloudy to overcast occasional rain()slowly south moderate or good.
()any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local quarantine officer must be notified immediately.
Should any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local Quarantine Officer must be()immediately.
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
翻译:With Average or With Particular Average(WA or WPA)()
【参考范例二】Animals or Pets What is your favourite animal?
根据《水利水电工程地质勘察规范》(GB50487—2008)规定,应在()阶段查明各类水利水电工程建筑物区的工程地质条件,对存在的工程地质问题进行分析评价,为建筑物设计和地基处理方案提供地质资料和建议。
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
大型水利水电工程初步设计阶段水库区工程地质勘察主要应对水库地质条件及()等工程地质问题分析评价。
大型水利水电工程初步设计阶段水库区工程地质勘察主要应对水库地质条件及(  )等工程地质问题分析评价。
广告位招租WX:84302438

免费的网站请分享给朋友吧