首页/ 题库 / [单选题]高压开关在额定电压下能正常开断的()称额的答案

高压开关在额定电压下能正常开断的()称额定开断电流。

单选题
2021-07-17 23:26
A、最小电流
B、最大电流
C、热稳定电流
D、短路电流
查看答案

正确答案
B

试题解析

感兴趣题目
电力系统是动力系统的一部分,它由发电厂的发电机及配电装置,升压及降压变电所、输配电线路及用户的用电设备所组成。
系统中所有电力用户的用电设备所消耗的电功率总和就是电力系统的负荷,亦称电力系统的综合用电负荷。电力系统负荷加上电力网的功率损耗就是各发电厂应该供给的功率,称为电力系统的供电负荷,在此基础上再加上发电厂厂用电消耗的功率就是各发电厂应该发出的功率,称为()。
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
A salvor may be()the whole or part of the payment due under Salvage Convention to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part or if the salvor has been guilty of fraud or other dishonest conduct.
The () is used for hauling in or letting out the wires or ropes.
Vessels must be()valid certificate of nationality or certificated of registry or license.
When loading or discharging dry mud or cement,crew members should use goggles and().
Effects which are dutiable or subject to prohibitions or restrictions should be declared in ().
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
依据《电力安全工作规程(发电厂和变电站电气部分)》,发生人身触电时,应立即断开有关设备的()
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

电力系统是发电厂、变电站(所)、电力线路及用户连接起来构成的整体。  (  )
电力系统是由发电厂、变、配、电装置、电力线路和用户所组成
系统中所有电力用户的用电设备所消耗的电功率总和就是电力系统的负荷,亦称电力系统的()。电力系统负荷加上电力网的功率损耗就是各发电厂应该供给的功率,称为电力系统的(),在此基础上再加上发电厂厂用电消耗的功率就是各发电厂应该发出的功率,称为电力系统的()
发电厂、变电所电力生产用低压电气装置共用的接地装置接地电阻不大于()。
国家电监会《发电厂并网运行管理规定》中规定,电力调度机构针对电力系统运行中存在的安全问题,应及时制定();涉及并网发电厂的,并网发电厂应予落实。
依据《电力二次系统安全防护规定》,电力调度机构、发电厂、变电站等运行单位的电力二次系统安全防护实施方案须经过()的审核,方案实施完成后应当由上述机构验收。
电力系统是由发电厂、变、配电装置,电力线路和用户所组成。()
电力系统是有发电厂、电力网和()组成的统一整体
电力系统是由发电厂、电力网、用户组成的相互连接的整体。
()any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local quarantine officer must be notified immediately.
Should any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local Quarantine Officer must be()immediately.
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
翻译:With Average or With Particular Average(WA or WPA)()
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
广告位招租WX:84302438

免费的网站请分享给朋友吧