首页/ 题库 / [单选题]计算挡土墙压力时,荷载效应( )。的答案

计算挡土墙压力时,荷载效应( )。

单选题
2021-07-17 23:44
A、应按正常使用极限状态下荷载效应的标准组合
B、应按正常使用极限状态下荷载效应的准永久组合
C、应按承载能力极限状态下荷载效应的基本组合,采用相应的分项系数
D、应按承载能力极限状态下荷载效应的基本组合,但其分项系数均为1.0
查看答案

正确答案
D

试题解析

感兴趣题目
桥梁结构的整体计算采用车辆荷载,桥梁结构的局部加载、涵洞、桥台和挡土墙土压力等的计算采用车道荷载。车道荷载和车辆荷载可以叠加。
用朗肯土压力理论计算挡土墙土压力时,适用条件之一是( )。
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
A salvor may be()the whole or part of the payment due under Salvage Convention to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part or if the salvor has been guilty of fraud or other dishonest conduct.
The () is used for hauling in or letting out the wires or ropes.
Vessels must be()valid certificate of nationality or certificated of registry or license.
When loading or discharging dry mud or cement,crew members should use goggles and().
Effects which are dutiable or subject to prohibitions or restrictions should be declared in ().
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

计算挡土墙压力时,荷载效应( )。
计算车辆荷载引起的土压力时,∑G应为挡土墙的()长度与挡土墙后填土的()长度乘积面积内的车轮重力。
采用库伦土压力理论计算挡土墙土压力时,基本假设之一是()。
用朗肯土压力理论计算挡土墙土压力时,适用条件之一是()。
病例对照研究进行统计性推断时不匹配分层资料总的OR值计算公式是
()any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local quarantine officer must be notified immediately.
Should any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local Quarantine Officer must be()immediately.
已知A=40;B=30;C=100;D=50,逻辑“与”运算符为and,“或”运算符为or,“非”运算符为not。计算表达式(A>B+20)or(B+60<>
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
当挡土墙后填土面有连续均布荷载作用时,通常土压力的计算方法是()。
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
采用库伦土压力理论计算挡土墙土压力时,基本假设之一是()。
翻译:With Average or With Particular Average(WA or WPA)()
桥梁结构的整体计算采用什么荷载,涵洞、桥台和挡土墙土压力计算采用什么荷载,两种荷载的作用如何叠加?
按《建筑地基基础设计规范》(GB50007-2011),在计算挡土墙土压力或滑坡稳定性时应采用()荷载效应组合。()
广告位招租WX:84302438

免费的网站请分享给朋友吧