首页/ 题库 / [单选题]Linda is not interes的答案

Linda is not interested in political __________.

单选题
2021-07-18 00:09
A、issues
B、problems
C、questions
D、puzzles
查看答案

正确答案
B

试题解析

相关题目
Linda has never worked in radio or television before.
The point is not who said the words, _____ they are true or not.
逻辑表达式 1>0 and Not 2<7 or 2>6的值为
逻辑表达式 1>0 and Not 2<7 or 2>6的值为
Who can tell you whether an emergency is a “disaster” or not?
布尔逻辑算符AND/OR/NOT的优先顺序是( )
1_____education is the instruction that occurs when the instructor and students are separated by distance or time,or both
CASE OF DEATH OR SERIOUS INJURY TO A PERSON IN AN ACCIDENT OR SHIPPING DISASTER is().
Nomlnal(or money) interest rate 名义(或货币)利率
() is not properly set thus causing either advanced or retarded firing.
The () is not properly set thus causing either advanced or retarded firing.
Damage to cargo caused by fumes or vapor from liquids,gases, or solids is known as().
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
Where a container,pallet or similar article of transport is used to consolidate goods,the number of packages or units enumerated in the bill of lading as packed in such article of transport()to be the number of packages or units in calculating the amount beyond which the carrier or the ship is not reliable.
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
表达式1.5+32>2 Or 7 Mod 3<4 And Not 1的运算结果是( )。
表达式1+32>1 Or 6 Mod 4<3 And Not 1的运算结果是( )。
表达式1.5+32>2 Or7 Mod 3<4 And Not 1的运算结果是( )。

Project selection methods involve measuring value or attractiveness to the project owner or sponsor and may include other organizational decision criteria ()is not a project selection method.

Project selection methods involve measuring value or attractiveness to the project owner or sponsor and may include other organizational decision criteria. ( )is not a project selection method.
广告位招租WX:84302438

免费的网站请分享给朋友吧