首页/ 题库 / [判断题]拉(压)弯组合变形:杆件同时受横向力和轴的答案

拉(压)弯组合变形:杆件同时受横向力和轴向力的作用而产生的变形。

判断题
2021-07-19 03:28
A、正确
B、错误
查看答案

正确答案
A

试题解析
A

相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

根据《水利水电工程施工质量检验与评定规程》SL176—2007,《水利水电基本建设工程单元工程质量评定标准》是单元工程质量等级评定标准,其主要包括()个方面,包括水工建筑物、金属结构及启闭机械安装工程和水轮发电机组安装工程等。
根据《水利水电建设工程验收规程》SL223-2008,按照验收主持单位,水利水电工程验收可分为()。
水利水电工程中永久性建筑物的级别,应根据()确定。
Mainly east 3 or 4 partly cloudy to overcast occasional rain()slowly south moderate or good.
()any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local quarantine officer must be notified immediately.
Should any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local Quarantine Officer must be()immediately.
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
水利工程按其()可分为防洪工程、农田水利工程、水力发电工程、航道和港口工程、供水和排水工程、环境水利工程、海涂围垦工程等。
翻译:With Average or With Particular Average(WA or WPA)()
根据《水利水电工程地质勘察规范》(GB50487—2008)规定,应在()阶段查明各类水利水电工程建筑物区的工程地质条件,对存在的工程地质问题进行分析评价,为建筑物设计和地基处理方案提供地质资料和建议。
工程水文学在水利水电工程的()阶段将发挥作用。
初步设计阶段水利水电工程天然建筑材料勘察应()。
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
《水利水电工程验收规程》规定,水利水电工程的阶段验收包括()。
广告位招租WX:84302438

免费的网站请分享给朋友吧