首页/ 题库 / [单选题]Excuse me. Is this t的答案

Excuse me. Is this table taken?()

单选题
2021-07-23 01:32
A、We haven‘t booked the dishes.
B、We haven‘t ordered the dishes.
C、Yeah. I‘m saving these seats for friends.
D、Yeah. I‘m stuffed.
查看答案

正确答案
C

试题解析

相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing
CASE OF DEATH OR SERIOUS INJURY TO A PERSON IN AN ACCIDENT OR SHIPPING DISASTER is().
Where the contract is to insure the subject-matter at and from,or from one place to another or others,the policy is called a().
Damage to cargo caused by fumes or vapor from liquids,gases, or solids is known as().
A seaman may have all or part of his wages deposited by allotment to a bank or savings institution. Which of the following is NOT a requirement for this type of allotment? ()
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
During loading or discharging,where the delay is due to the Shipowner’s fault,or that of his servants or agents acting within their authority,the time actually delayed is to be()in calculating lay days.
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
Where a container,pallet or similar article of transport is used to consolidate goods,the number of packages or units enumerated in the bill of lading as packed in such article of transport()to be the number of packages or units in calculating the amount beyond which the carrier or the ship is not reliable.
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
Traditionally, people gave Christmas gifts or money to their staff or servants on ()which is the day after Christmas.
翻译:With Average or With Particular Average(WA or WPA)()
读网络教育学院非英语专业和非艺术类专业专升本的学生报考统考,除计算机应用基础外,还需报考()
The important thing is that this is a major breakthrough. “breakthrough” here means an important development or achievement.
Project(71)is an uncertain event or condition that,if it occurs,has a positive or a negative effect on at least one project objective,such as time,cost,scope,or quality.
Project ______is an uncertain event or condition that,if it occurs,has a positive or a negative effect on at least one project objective,such as time,cost,scope,or quality.
● Project(71)is an uncertain event or condition that, if it occurs, has a positive or a negative effect on at least one project objective, such as time, cost, scope, or quality.(71)
广告位招租WX:84302438

免费的网站请分享给朋友吧