首页/ 题库 / [单选题]The manager promised的答案

The manager promised to keep me _____ of how our business was going on.

单选题
2021-09-01 17:34
A、to be informed
B、informed
C、on informing
D、informing
查看答案

正确答案
A

试题解析

感兴趣题目
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
The goal, which they are unlikely to live to see , is tocure, prevent or manage all diseasesin the next 80or so years.
If necessary to avoid collision or allow more time to()the situation,a vessel shall slacken her speed or take all way off by stopping or reversing her means of propulsion.
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
A salvor may be()the whole or part of the payment due under Salvage Convention to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part or if the salvor has been guilty of fraud or other dishonest conduct.
The schedule management plan is a component of the project management plan. The Schedule management plan maybe formal or informal, highly detailed or broadly framed, based upon the()of the project, and includes appropriate control thresholds.
The schedule management plan is a component of the project management plan The schedule management plan may be formal or informal, highly detailed or broadly framed, based upon the()of the project, and includes appropriate control thresholds.
() system is arranged to ensure that water can be drawn from any tank or the sea and discharged to any other tank or the sea as required to trim the vessel.
Never()the lifeboat or lifecraft disengaging locks or hydrostatic release gears because it can cause them to fail to function.
Never()the lifeboat or lifecraft disengaging hocks or hydrostatic release gears because it can cause them to fail to function.
Any alteration of course and/or speed to avoid collision shall,if the circumstances of the case admit,()to another vessel observing visually or by radar.
相关题目
The manager promised to keep me _____ of how our business was going on.
The manager promised to keep me _____ of how our business was going on.
Now almost all the parents want their children to learn the piano or the violin, _____ their children are willing or not.( )
The manager or his assistant ______ planning to go
福建水利电力职业技术学院正式更名为福建水力电力职业技术学院的时间是()
I bought a washing-machine and asked to have it sent to my house. The manager of the store promised to make a prompt()
Where the contract is to insure the subject-matter at and from,or from one place to another or others,the policy is called a().
The Urgency Signal()indicates that the station calling has a very urgent message to transmit concerning the safety of a ship or aircraft,or of some person on board or within sight.
()means any person by whom or in whose name or on whose behalf a contract of carriage of goods by sea has been concluded with a carrier,or any person by whom or in whose name or on whose behalf the goods are actually delivered to the carrier in relation to the contract of carriage of goods by sea.
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
During loading or discharging,where the delay is due to the Shipowner’s fault,or that of his servants or agents acting within their authority,the time actually delayed is to be()in calculating lay days.
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
Where a container,pallet or similar article of transport is used to consolidate goods,the number of packages or units enumerated in the bill of lading as packed in such article of transport()to be the number of packages or units in calculating the amount beyond which the carrier or the ship is not reliable.
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
The Project Management Triangle is a model of the constraints of project management. These constraints have been listed scope (or quality), ( ), and cost
The()enables water to be blow down or emptied from the boilerIt may be used when partially or completely emptying the boiler.
The right to limit liability in connection with the ship()also extended to Charterers and any person interested in or in possession of the vessel and,in particular,any manager or operator of her.
The“person in the phrase ”to designate a person or persons ashore having direct access to the highest level of management” refers to ().
()is entitled to enter into,with a shipper,any agreement,stipulation,condition,reservation or exception as to the responsibility and liability of the carrier or the ship for the loss of or damage to,or in connection with,the custody and care and handling of the goods prior to the loading on,and subsequent to the discharge from,the ship on which the goods are carried by sea.
Although the Shipowner may be responsible for the loss or damage to the goods,his liability may be limited()the terms of the contract or the statute.
广告位招租WX:84302438

免费的网站请分享给朋友吧