首页/ 题库 / [单选题]2011年1月18日,我国自主研发的地理的答案

2011年1月18日,我国自主研发的地理信息综合服务网站正式上线运行。该网站中文名称为

单选题
2021-09-01 21:04
A、地理中国
B、天地图
C、中国国家地理
D、天下图
查看答案

正确答案
B

试题解析

相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

A cabinet or space containing the controls or valves for the fixed firefighting system must be().
A cabinet or space containing the controls or valves for the fixed firefighting system must be().
2011年2011《测绘管理与法律法规》试题及答案 1,从事测绘活动的单位应该取得
1_____education is the instruction that occurs when the instructor and students are separated by distance or time,or both
甲合伙企业2011年1月1日签订合伙协议,在2011年1月5日申请设立登记,于2011年1月15日取得营业执照。营业执照上记载的日期为2011年1月14日。那么,合伙企业成立日期为()。
Mainly east 3 or 4 partly cloudy to overcast occasional rain()slowly south moderate or good.
()any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local quarantine officer must be notified immediately.
Should any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local Quarantine Officer must be()immediately.
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
翻译:With Average or With Particular Average(WA or WPA)()
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
一单位工程自2011年10月1日全部完工,并与2011年10月28日进行了竣工验收,2011年11月15日完成工程备案,该工程保修期应从()计算。
广告位招租WX:84302438

免费的网站请分享给朋友吧