首页/ 题库 / [单选题]施工组织总设计的编制依据有( )。的答案

施工组织总设计的编制依据有( )。

单选题
2021-09-01 21:04
A、计划文件及有关合同
B、设计文件及有关资料
C、经过会审的图纸
D、现行规范、规程和有关技术资料
查看答案

正确答案
A

试题解析

相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

按编制对象的()不同将施工组织设计分为施工组织总设计、单位工程施工组织设计和分部分项工程施工组织设计。
施工组织总设计、单位工程施工组织设计、分部分项工程施工设计,编制时共有内容是( )。
Mainly east 3 or 4 partly cloudy to overcast occasional rain()slowly south moderate or good.
()any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local quarantine officer must be notified immediately.
Should any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local Quarantine Officer must be()immediately.
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
编制施工组织总设计设计下列工作:①施工总平面图设计;②拟定施工方案;③编制施工总进度计划;④编制资源需求计划;⑤计算主要工种的工程量。正确的编制程序是( )。
编制施工组织总设计涉及下列工作:①施工总平面图设计;②拟定施工方案;③编制施工总进度计划,④编制资源需求计划,⑤计算主要工种的工程量。正确的编制程序是()。
编制施工组织总设计涉及下列工作:①施工总平面图设计;②拟定施工方案;③编制施工总进度计划;④编制资源需求计划;⑤计算主要工种的工程量。正确的编制程序是(  )。
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
翻译:With Average or With Particular Average(WA or WPA)()
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
施工组织总设计是以单个单位工程为主要对象编制的施工组织设计
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
广告位招租WX:84302438

免费的网站请分享给朋友吧