首页/ 题库 / [单选题]George Washington, t的答案

George Washington, the first President of the U.S., is known ____ the Father of His Country.( )

单选题
2021-09-01 22:27
A、for
B、like
C、as
D、because
查看答案

正确答案
C

试题解析

感兴趣题目
癸卯学制将高等教育机构明确分为大学堂、高等学堂和()。
四川大学前身四川中西学堂是四川总督张之洞奉命所建。
位于苏州市吴江区七都镇的太湖大学堂是国学大师()先生晚年居住与讲学的书院。
Although the Shipowner may be responsible for the loss or damage to the goods,his liability may be limited()the terms of the contract or the statute.
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
A salvor may be()the whole or part of the payment due under Salvage Convention to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part or if the salvor has been guilty of fraud or other dishonest conduct.
The () is used for hauling in or letting out the wires or ropes.
The()may examine or re-examine the goods or take samples from them straightaway in the absence of the consignee or the consignor whenever it considers this necessary.
官立山东大学堂的首任校长是谁?()
__________John Adams who in 1775 recommended George Washington toBe com:mander in chief of the Continental Army.
相关题目
函数 青书学堂.png 的定义域为
函数 青书学堂.png 的定义域为
A cabinet or space containing the controls or valves for the fixed firefighting system must be().
A cabinet or space containing the controls or valves for the fixed firefighting system must be().
1. 四川农业大学的前身四川通省农业学堂成立于
George Washington, the first President of the U.S., is known ____ the Father of His Country.( )
Goods of an inflammable,explosive or dangerous nature to the shipment whereof the carrier,master or agent of the carrier,has not consented,with knowledge of their nature and character,may at any time before discharge,()at any place or destroyed or rendered innocuous by the carrier without compensation.
贵州在光绪二十八年()由贵州巡抚创设贵州大学堂。
In the northern hemisphere, the largest waves or swells created by a typhoon or hurricane will be located().
The Urgency Signal()indicates that the station calling has a very urgent message to transmit concerning the safety of a ship or aircraft,or of some person on board or within sight.
If the state of the goods at the time they were handed over to the consignee has been the subjectof a joint survey or inspection by the parties,notice in writing()be given of loss or damage ascertained during such survey or inspection.
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
During loading or discharging,where the delay is due to the Shipowner’s fault,or that of his servants or agents acting within their authority,the time actually delayed is to be()in calculating lay days.
The court may reduce or deny remuneration if it appears that the salvors have by their fault ()or have been guilty of theft,receiving stolen goods,or other acts of fraud.
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
Where a container,pallet or similar article of transport is used to consolidate goods,the number of packages or units enumerated in the bill of lading as packed in such article of transport()to be the number of packages or units in calculating the amount beyond which the carrier or the ship is not reliable.
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
The()enables water to be blow down or emptied from the boilerIt may be used when partially or completely emptying the boiler.
The vessel or other goods upon which the Works have been carried out must be()from the Repairer’s worksite within 3 days after the invoice date or in accordance with other written notification by the Repairer to the Customer.
创办山西大学堂的本意是()。
广告位招租WX:84302438

免费的网站请分享给朋友吧