首页/ 题库 / [单选题]Fresh water is impor的答案

Fresh water is important to our ____life.

单选题
2021-09-01 22:56
A、daily
B、weekly
C、monthly
D、yearly
查看答案

正确答案
A

试题解析

相关题目
Prior to getting underway in fresh or brackish water,the Master must().
There will usually be summaries or daily account tables for heavy oil, diesel oil, lubricating oil, and fresh water, which will be compiled()
1. 四川农业大学的前身四川通省农业学堂成立于
Without water, _________ no plants or animals.
1_____there is no rain,farming is difficult or impossible
1_____education is the instruction that occurs when the instructor and students are separated by distance or time,or both
The United States is composed of fifty states,______ are separated from the others by land or water
CASE OF DEATH OR SERIOUS INJURY TO A PERSON IN AN ACCIDENT OR SHIPPING DISASTER is().
Damage to cargo caused by fumes or vapor from liquids,gases, or solids is known as().
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
During loading or discharging,where the delay is due to the Shipowner’s fault,or that of his servants or agents acting within their authority,the time actually delayed is to be()in calculating lay days.
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
The()enables water to be blow down or emptied from the boilerIt may be used when partially or completely emptying the boiler.
Traditionally, people gave Christmas gifts or money to their staff or servants on ()which is the day after Christmas.
华东理工大学网络教育实行的是弹性学制,高起专和专升本两种层次的学习年限均是()
Charging is the filling of the engine cylinder with a supply or charge of fresh air () compression.
() provides the head or pressure to supply the domestic water where required.
Project(71)is an uncertain event or condition that,if it occurs,has a positive or a negative effect on at least one project objective,such as time,cost,scope,or quality.
● Project(71)is an uncertain event or condition that, if it occurs, has a positive or a negative effect on at least one project objective, such as time, cost, scope, or quality.(71)
Is this()longer or shorter?
广告位招租WX:84302438

免费的网站请分享给朋友吧