首页/ 题库 / [单选题]We will finish the p的答案

We will finish the project step_______.

单选题
2021-09-02 00:07
A、by chance
B、by step
C、by the way
D、by accident
查看答案

正确答案
B

试题解析

相关题目

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

Time ____, we will arrange for the tourists to visit two or three more remote spots of culture value.
Whether we will go or not __________ the weather.
A cabinet or space containing the controls or valves for the fixed firefighting system must be().
A cabinet or space containing the controls or valves for the fixed firefighting system must be().
before the problem grows into a big one, we have to take_____. Or we will suffer a great loss.( )
Now almost all the parents want their children to learn the piano or the violin, _____ their children are willing or not.( )
17I remembered the day when World War II finished I was eight or nine at the time , and we heard it ___ when we were at the table
We need friends to ________, or we will feel lonely(单选)—4分
If we carry out our plan with()we will surely achieve our goal sooner or later.

Consider the events_% tables in performance Schema.
Which two methods will clear or reset the collected events in the tables?()

Shall we sit up here on the grass or down there near the water? ()
In the northern hemisphere, the largest waves or swells created by a typhoon or hurricane will be located().
We can hardly accept any marks()or damage()the cargo.
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
The discharge rate or capacity of a centrifugal pump will vary directly as the ().
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
The ship will be responsible for the cargo loaded or unloaded().
The ship will be responsible for the cargo loaded or unloaded().
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
广告位招租WX:84302438

免费的网站请分享给朋友吧