(1)不妥当。主要是施工组织设计变更方案的审批程序不符合有关规定。 
正确做法:施工组织设计编制后应由企业技术负责人审批,有变更时要办理变更手续,变更的施工组织设计仍由企业技术负责人审批。 
(2)不正确。厂拌石灰粉煤灰稳定碎石混合料,自拌合开始至摊铺有时限要求。 
正确做法:拌成的混合料堆放时间不得超过24h,否则将影响石灰粉煤灰稳定碎石混合料的强度,影响基层的施工质量。 
(3)有两处违反施工规范的规定: 
1)养护期间应封闭交通,严禁重型车辆通行。 
2)严禁采用薄层贴补方式进行找平。 
其危害主要有: 
①基层养护期间有重型车辆通行,会影响石灰粉煤灰稳定碎石基层的强度增长和平整度。 
②采用石灰粉煤灰稳定碎石薄层贴补方式进行找平,将破坏道路基层的整体性,造成路面面层的局部破损。


试题解析

相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

A cabinet or space containing the controls or valves for the fixed firefighting system must be().
A cabinet or space containing the controls or valves for the fixed firefighting system must be().
biomembrane,or biological membrane (生物膜)
CASE OF DEATH OR SERIOUS INJURY TO A PERSON IN AN ACCIDENT OR SHIPPING DISASTER is().
Mainly east 3 or 4 partly cloudy to overcast occasional rain()slowly south moderate or good.
()any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local quarantine officer must be notified immediately.
Should any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local Quarantine Officer must be()immediately.
Damage to cargo caused by fumes or vapor from liquids,gases, or solids is known as().
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
管理(或非浮动)价格Administered(or inflexible) prices
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
翻译:With Average or With Particular Average(WA or WPA)()
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
广告位招租WX:84302438

免费的网站请分享给朋友吧