首页/ 题库 / [单选题]为安装进口设备、聘用外国工程技术人员进行的答案

为安装进口设备、聘用外国工程技术人员进行指导所发生的费用应计入( )

单选题
2021-09-02 12:02
A、可行性研究费
B、研究试验费
C、引进技术和引进设备其他费
D、生产准备及开办费
查看答案

正确答案
C

试题解析

感兴趣题目
可以在()阶段采用Make-or-buy决策分析。
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
A salvor may be()the whole or part of the payment due under Salvage Convention to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part or if the salvor has been guilty of fraud or other dishonest conduct.
The () is used for hauling in or letting out the wires or ropes.
Vessels must be()valid certificate of nationality or certificated of registry or license.
When loading or discharging dry mud or cement,crew members should use goggles and().
Effects which are dutiable or subject to prohibitions or restrictions should be declared in ().
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
施工结算在机电工程项目中的应用真题案例解析与考点分值计算: 案例:某企业(业主)一套加氢装置扩建安装工程由某施工单位承担.工程包括:动设备安装23台,静设备安装15台,非标设备现场制做240吨,管道安装23000m.合同工期6个月.其中动、静设备安装,非标设备制做统称为设备安装工程,其直接工程费约300万元.合同规定:设备安装费按照《建筑安装工程费用项目组成》(建标206号文件)中的综合单价法计价和结算.设备安装各项费用的取值如下:措施费为直接工程费的5%:间接费为直接费的10%;利润为直接费和间接费的8%,税率为3.4%.合同其他条款如下: ⑴管道安装费按0.016万元/米计算,管道安装实际工程量超过估算工程量10%时进行调整,调价系数0.9. ⑵开工前业主向施工单位支付估算合同总价20%的工程预付款:工程预付款在最后两个月扣除,每月扣50%. ⑶业主每月从施工单位的工程款中按3%的比例扣留工程质量保修金. ⑷施工单位前3个月进行设备安装,从第3个月开始进行管道安装.其中管道安装工程每月实际完成并经监理工程师签证确认的工程量如下表: 时间第3月第4月第5月第6月 管道安装工程量(m)5000800090006000 工程保修期间,一台现场制做的设备被损坏,业主多次催促施工单位修理,施工单位一再拖延,最后业主请其他施工单位修理,修理费1.5万元. 【问题】: ⑴计算设备安装预算造价(结果保留2住小数),要求列出各项费用计算步骤. ⑵计算全部安装工程预付款总额. ⑶计算第6月管道安装工程量价款.监理工程师应签证的管道安装工程款是多少?实际签发的付款凭证金额是多少? ⑷被损坏设备的修理费用应出自何处?
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
对于引进设备的安装工程概算,通常采用的设备安装工程概算编制的方法为()。
相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

为安装进口设备、聘用外国工程技术人员进行指导所发生的费用应计入( )
根据()将机电安装工程施工中的特种作业人员界定为两大类:特种设备作业人员和特殊工种作业人员。
OR的流行病学含义为()。
ORS液配制后的张力为()
Mainly east 3 or 4 partly cloudy to overcast occasional rain()slowly south moderate or good.
列入城建档案馆接受范围的工程,建设单位在组织工程竣工验收前,应提请城建档案管理机构对工程档案进行预验收。建设单位未取得城建档案管理出具的(),不得组织工程竣工验收。
列及城建档案馆(室)档案接收范围的工程,()在组织工程竣工验收前,应提前城建档案管理机构对工程档案进行预验收。
列及城建档案馆(室)档案接收范围的工程,()在组织工程竣工验收前,应提请城建档案管理机构对工程档案进行预验收。
()any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local quarantine officer must be notified immediately.
Should any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local Quarantine Officer must be()immediately.
已知A=40;B=30;C=100;D=50,逻辑“与”运算符为and,“或”运算符为or,“非”运算符为not。计算表达式(A>B+20)or(B+60<>
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
翻译:With Average or With Particular Average(WA or WPA)()
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
广告位招租WX:84302438

免费的网站请分享给朋友吧