首页/ 题库 / [填空题]无梁楼盖在计算时可以按照()和()两的答案

无梁楼盖在计算时可以按照()和()两

填空题
2021-09-02 15:28
查看答案

正确答案
经验系数法,等代系数法

试题解析

感兴趣题目
在建筑工程中,无梁楼盖的特点是(),通风采光条件好,支模简单,但用钢量较大。
某三层楼的仓库,为了获得较大的有效空间,采用了无梁楼盖的设计方案。无梁板柱设计如下图所示,柱下式形独立基础,现浇C30矩形柱断面400×400mm,采用柱帽与无梁楼板连接,造型规则的倒棱台式柱帽高度400mm,现浇混凝土楼板厚度150mm。 根据《房屋建筑与装饰工程工程量计算规范(2013)》,下列与无梁楼盖工程量有关的叙述中,()是正确的。
可以在()阶段采用Make-or-buy决策分析。
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
A salvor may be()the whole or part of the payment due under Salvage Convention to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part or if the salvor has been guilty of fraud or other dishonest conduct.
The () is used for hauling in or letting out the wires or ropes.
Vessels must be()valid certificate of nationality or certificated of registry or license.
在进行工程计价时,实物工程量的计量单位是由单位价格的计量单位决定的。()
按水利工程计价规范,以下安装项目中按照招标设计图示尺寸计算的有效长度计量的是()。
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

指令ORS功能,可实现多个指令块的“与”运算。
水利工程计价规范,钻孔与灌浆工程中,工程量计算规则按招标设计图示尺寸计算的有效灌浆长度计量的是()
无梁楼盖在计算时可以按照()和()两
Logistic回归系数与优势比OR的关系为()。
在500名病例与500名对照的匹配病例对照研究中,有400名病例与100名对照具有暴露史。据此资料,计算OR值为()
在进行工程计价时,实物工程量的计量单位是由单位价格的计量单位决定的。()
病例对照研究进行统计性推断时不匹配分层资料总的OR值计算公式是
()any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local quarantine officer must be notified immediately.
Should any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local Quarantine Officer must be()immediately.
已知A=40;B=30;C=100;D=50,逻辑“与”运算符为and,“或”运算符为or,“非”运算符为not。计算表达式(A>B+20)or(B+60<>
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
翻译:With Average or With Particular Average(WA or WPA)()
现浇整体式楼盖可分为()、密肋楼板和无梁楼盖。
楼板总分为哪两大项,无梁楼盖靠什么承载重力?
广告位招租WX:84302438

免费的网站请分享给朋友吧