首页/ 题库 / [单选题]How long is the long的答案

How long is the longest cross-sea bridge

单选题
2021-09-02 16:16
A、It has a total length of 68.988 km.
B、It has a total length of 94.968 km.
C、It has a total length of 49.968 km.
查看答案

正确答案
C

试题解析

相关题目
_____ed ucation is the instruction that occurs when the instructor and studen t s are separated by distance or time,or both.
According to the passage,what does the sentence “no matter where or how they are performed"(para.1) really mean?
__________ is the act performed by or resulting from saying something; it is the consequence of, or the change brought about by the utterance.
Grammar presentation is concerned with how to make the students understand or discover grammar rules. it is ___ that helps students develop grammatical capability.
These two stanzas express the speaker’s ()to come back to his love, no matter how far, or hard the journey is
How long is the longest cross-sea bridge
1_____education is the instruction that occurs when the instructor and students are separated by distance or time,or both
When the Pilot is embarked he or she ().
When the pilot is embarked he or she().
Where the contract is to insure the subject-matter at and from,or from one place to another or others,the policy is called a().
The quantity or condition which is measured and controlled is known as the ()
The law-making or the legislative body in the government is ()
In the emergency alarm signals, if the alarm or whistle two long sounds followed by one short sound for 1 minute, it is the () emergency.
How long is the economic distance for motor? ()
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
During loading or discharging,where the delay is due to the Shipowner’s fault,or that of his servants or agents acting within their authority,the time actually delayed is to be()in calculating lay days.
Where a container,pallet or similar article of transport is used to consolidate goods,the number of packages or units enumerated in the bill of lading as packed in such article of transport()to be the number of packages or units in calculating the amount beyond which the carrier or the ship is not reliable.
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
● The personal computer or (72) is the smallest general-purpose computer.(72)
● The personal computer or (72) is the smallest general-purpose computer.
广告位招租WX:84302438

免费的网站请分享给朋友吧