首页/ 题库 / [单选题]It took the experts 的答案

It took the experts several months to decide on the()for the new airport

单选题
2021-09-02 17:20
A、   occur
B、   name
C、    site
D、   example
查看答案

正确答案
C

试题解析

感兴趣题目
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
The guard, fencing or shielding for moving parts or machinery can be removed for repair only when the machinery it belongs to()
It will be a relief over the death of a friend or a relative if the friend or relative dies from ______.
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
A salvor may be()the whole or part of the payment due under Salvage Convention to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part or if the salvor has been guilty of fraud or other dishonest conduct.
The () is used for hauling in or letting out the wires or ropes.
The()may examine or re-examine the goods or take samples from them straightaway in the absence of the consignee or the consignor whenever it considers this necessary.
During counterflooding to correct a severe list or trim aggravated by an off-center load,a ship suddenly takes a list or trim to the opposite side. You should().
Should it appear that war or blockade would prevent the vessel from safely reaching the port of destination and / or discharging the goods thereat,the Carrier().
Never()the lifeboat or lifecraft disengaging locks or hydrostatic release gears because it can cause them to fail to function.
Never()the lifeboat or lifecraft disengaging hocks or hydrostatic release gears because it can cause them to fail to function.
相关题目

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

A cabinet or space containing the controls or valves for the fixed firefighting system must be().
A cabinet or space containing the controls or valves for the fixed firefighting system must be().
They beat it away or pat the fat ____ it becomes firm.( )
__________ is the act performed by or resulting from saying something; it is the consequence of, or the change brought about by the utterance.
【单选题】They do it _ the knowledge or help of their partents.
It()(already find) that the moon has no life or vegetation
It took the experts several months to decide on the()for the new airport
The forced draught fan should be started and air passed through the furnace for several minutes to “()” it of any exhaust gas or oil vapors.
Goods of an inflammable,explosive or dangerous nature to the shipment whereof the carrier,master or agent of the carrier,has not consented,with knowledge of their nature and character,may at any time before discharge,()at any place or destroyed or rendered innocuous by the carrier without compensation.
In the northern hemisphere, the largest waves or swells created by a typhoon or hurricane will be located().
The Urgency Signal()indicates that the station calling has a very urgent message to transmit concerning the safety of a ship or aircraft,or of some person on board or within sight.
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
The international transport and the international logistics are same. Is it correct or not? ()
The court may reduce or deny remuneration if it appears that the salvors have by their fault ()or have been guilty of theft,receiving stolen goods,or other acts of fraud.
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
The guard, fencing or shielding for moving parts or machinery can be removed for repair only when the machinery it belongs to()
It’s()to stow optional cargo in the lower hold.You’d better give it block stowage in the tweendecks,then it can be easily discharged either at Shanghai,or Dalian or Tianjin.
It should be apparent that little or nothing is gained by opening a drain at the same time as or after admitting steamThe above sentence probably means ().
广告位招租WX:84302438

免费的网站请分享给朋友吧