首页/ 题库 / [多选题]单选,10分] 断裂力学按裂纹扩展形式将的答案

单选,10分] 断裂力学按裂纹扩展形式将介质中存在的裂纹有三种形式,下列说法错误的是

多选题
2021-09-03 16:17
A、(a)图是张开型裂纹,即所谓的的型,上下表面的位移是对称的,由于法向位移的间断造成裂纹上下表面张开;
B、(b)图是滑开型裂纹,及所谓的的的型,由于上下表面切向位移间断,引起上下表面滑开;
C、(c)图是撕开型裂纹,即所谓的的的的型,是由于上下表面切向位移间断,为扭剪破坏;
D、图(a)、(b)和(c)都是对称型裂纹。
查看答案

正确答案
D@#@D

试题解析

相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

( )是以矿山岩石力学为基础,与矿山工程、采矿工艺理论和实践密切结合的采矿工业的基础课程。
单选,10分] 下列那个不是水对岩石力学性质的影响
单选,10分] 断裂力学按裂纹扩展形式将介质中存在的裂纹有三种形式,下列说法错误的是
We need friends to ________, or we will feel lonely(单选)—4分
Mainly east 3 or 4 partly cloudy to overcast occasional rain()slowly south moderate or good.
()any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local quarantine officer must be notified immediately.
Should any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local Quarantine Officer must be()immediately.
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
翻译:With Average or With Particular Average(WA or WPA)()
岩石力学、土力学与工程地质学有何关系
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
广告位招租WX:84302438

免费的网站请分享给朋友吧