首页
题目
TAGS
首页
/
题库
/
[多选题]TG grammar has NOT s的答案
搜答案
TG grammar has NOT seen __________ stages of development
多选题
2021-09-03 16:25
A、three
B、four
C、five
D、six
查看答案
正确答案
A@#@B@#@D
试题解析
标签:
联大
信阳师范学院
英语语言学
感兴趣题目
Which security or functional zone name has special significance to the Junos OS?()
Once vessel has been cleared by Port Health or Immigration ()must proceed to appropriate berth or anchorage.
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
A salvor may be()the whole or part of the payment due under Salvage Convention to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part or if the salvor has been guilty of fraud or other dishonest conduct.
The () is used for hauling in or letting out the wires or ropes.
Vessels must be()valid certificate of nationality or certificated of registry or license.
When loading or discharging dry mud or cement,crew members should use goggles and().
Effects which are dutiable or subject to prohibitions or restrictions should be declared in ().
The Shipowner must not stow goods on deck()there is a trade usage to that effect or the Charterer has given his express or implied consent.
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
相关题目
Linda has never worked in radio or television before.
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing
It()(already find) that the moon has no life or vegetation
Goods of an inflammable,explosive or dangerous nature to the shipment whereof the carrier,master or agent of the carrier,has not consented,with knowledge of their nature and character,may at any time before discharge,()at any place or destroyed or rendered innocuous by the carrier without compensation.
()any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local quarantine officer must be notified immediately.
Should any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local Quarantine Officer must be()immediately.
The engine has one or two group of fuel pumps, depending upon ().
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
The Urgency Signal()indicates that the station calling has a very urgent message to transmit concerning the safety of a ship or aircraft,or of some person on board or within sight.
If the state of the goods at the time they were handed over to the consignee has been the subjectof a joint survey or inspection by the parties,notice in writing()be given of loss or damage ascertained during such survey or inspection.
()means any person by whom or in whose name or on whose behalf a contract of carriage of goods by sea has been concluded with a carrier,or any person by whom or in whose name or on whose behalf the goods are actually delivered to the carrier in relation to the contract of carriage of goods by sea.
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
翻译:With Average or With Particular Average(WA or WPA)()
In advanced PC bus or local bus,(73)has the fastest data throughput.
Project(71)is an uncertain event or condition that,if it occurs,has a positive or a negative effect on at least one project objective,such as time,cost,scope,or quality.
● Project(71)is an uncertain event or condition that, if it occurs, has a positive or a negative effect on at least one project objective, such as time, cost, scope, or quality.(71)
广告位招租WX:84302438
题库考试答案搜索网
免费的网站请分享给朋友吧