钢筋混凝土工程的模板拆除错误的做法是( )。

多选题
2021-09-03 16:29
A、混凝土初凝后即可拆除
B、先支的先拆,后支的后拆
C、先拆承重部分,后拆非承重部分
D、先拆底模,后拆侧模
E、先拆非承重部分,再拆承重部分
查看答案

正确答案
A@#@B@#@C@#@D

试题解析

感兴趣题目
大模板的拆除应符合下列规定:起吊大模板前应先检查模板与混凝土结构之间所有对拉螺栓、连接件是否全部拆除,必须在确认模板和混凝土结构之间无任何连接后方可起吊大模板,移动模板时不得碰撞墙体。()
符合框架结构养护与拆模的作业要求有楼板、梁混凝土浇筑完12h内要进行浇水养护,养护时间不少于7天、柱模板拆除时,当混凝土强度能保证其表面及棱角不因拆除模板而受损时,方可拆除、楼板、梁混凝土掺有添加剂的混凝土养护时间不少于()天。
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
A salvor may be()the whole or part of the payment due under Salvage Convention to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part or if the salvor has been guilty of fraud or other dishonest conduct.
The () is used for hauling in or letting out the wires or ropes.
Vessels must be()valid certificate of nationality or certificated of registry or license.
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
大模板工程是采用大型工具式模板浇筑钢筋混凝土墙体的机械化施工方法,其大型工具式模板称为大模板。
大模板的拆除时间,以保证其表面不因拆模而受到损坏为原则。一般情况下,当混凝土强度达到()以上时,可以拆除大模板。
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
模板的安装与拆除是模板工程施工的一个重要环节,必须做到()。
相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

关于模板拆除施工的做法,错误的是( )。
指令ORS功能,可实现多个指令块的“与”运算。
模板的拆除日期取决于砼养护时间,各模板的用途结构性质。( )
Logistic回归系数与优势比OR的关系为()。
钢筋混凝土工程的模板拆除错误的做法是( )。
在应用ORS液的过程中,错误的做法是()
在应用ORS液的过程中,错误的作法是()
在应用ORS液的过程中,错误的是()
()any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local quarantine officer must be notified immediately.
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
钢筋混凝土工程,模板拆除的规定为()
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
管理(或非浮动)价格Administered(or inflexible) prices
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
翻译:With Average or With Particular Average(WA or WPA)()
ANB指令是()指令,ORB是()指令,与and、or指令不同。
广告位招租WX:84302438

免费的网站请分享给朋友吧