首页/ 题库 / [多选题]企业由于计划减产,或因停电、待料、机器设的答案

企业由于计划减产,或因停电、待料、机器设备故障而停工,在停工期间所发生的一切费用属于( )

多选题
2021-09-03 16:31
A、修复费用
B、报废损失
C、废品损失
D、停工损失
查看答案

正确答案
B@#@C@#@D

试题解析

相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

A cabinet or space containing the controls or valves for the fixed firefighting system must be().
A cabinet or space containing the controls or valves for the fixed firefighting system must be().
企业由于计划减产,或因停电、待料、机器设备故障而停工,在停工期间所发生的一切费用属于( )
Mainly east 3 or 4 partly cloudy to overcast occasional rain()slowly south moderate or good.
()any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local quarantine officer must be notified immediately.
Should any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local Quarantine Officer must be()immediately.
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
翻译:With Average or With Particular Average(WA or WPA)()
在搜索引擎中输入检索式:“公司OR企业”表示检索结果()
计划停电管理根据停电计划的要求进行分析,以最小的停电范围和最短的停电时间来确定停电设备,列出造成停电的用户名单,并将停电计划信息自动传送给故障报修管理系统。
《牵引供电事故管理规则》规定,故障停电时间与计划停电时间重复的,在计算停电时间时应将计划停电时间扣除。
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
广告位招租WX:84302438

免费的网站请分享给朋友吧