首页
题目
TAGS
首页
/
题库
/
[多选题]24The match was post的答案
搜答案
24The match was postponed to the next day ____ bad weather
多选题
2021-09-03 16:53
A、because
B、because of
C、since
D、for
查看答案
正确答案
B@#@B@#@C@#@A
试题解析
标签:
中国医科大学
大学英语1
感兴趣题目
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
The British Empire was replaced by the British Commonwealth or the Commonwealth of Nations in()
The goal, which they are unlikely to live to see , is tocure, prevent or manage all diseasesin the next 80or so years.
If necessary to avoid collision or allow more time to()the situation,a vessel shall slacken her speed or take all way off by stopping or reversing her means of propulsion.
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
A salvor may be()the whole or part of the payment due under Salvage Convention to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part or if the salvor has been guilty of fraud or other dishonest conduct.
() system is arranged to ensure that water can be drawn from any tank or the sea and discharged to any other tank or the sea as required to trim the vessel.
Never()the lifeboat or lifecraft disengaging locks or hydrostatic release gears because it can cause them to fail to function.
Never()the lifeboat or lifecraft disengaging hocks or hydrostatic release gears because it can cause them to fail to function.
Several links have been broken so th at for the next day or two, what was formerly a contiguous area 0 has been broken into two parts. However, both parts of area 0 have working links into area 1 using routers with RID 1.1.1.1 and 2.2.2.2. Which answers list the command on the router with RID 1.1.1.1 to create a virtual link to help solve this temporary problem?()
Any alteration of course and/or speed to avoid collision shall,if the circumstances of the case admit,()to another vessel observing visually or by radar.
相关题目
Valentine’s Day (February 14th) is the day()sweethearts exchange gifts or go out to dinner.
Valentine’s Day (February 14th) is the day()sweethearts exchange gifts or go out to dinner.
Every piece was handed tentimes or more. And the drying
Now almost all the parents want their children to learn the piano or the violin, _____ their children are willing or not.( )
_________ in a person’s speech or writing usually ranges on a continuum from casual or colloquial to formal or polite according to the type of communicative situation.
The soldiers’ rapid march was ________ by the generals command; they were uncertain whether to go back or forward
24The match was postponed to the next day ____ bad weather
20The building plan was postponed again, and the delay was ______ part due to the heavy rain(5分)
Where the contract is to insure the subject-matter at and from,or from one place to another or others,the policy is called a().
The Urgency Signal()indicates that the station calling has a very urgent message to transmit concerning the safety of a ship or aircraft,or of some person on board or within sight.
()means any person by whom or in whose name or on whose behalf a contract of carriage of goods by sea has been concluded with a carrier,or any person by whom or in whose name or on whose behalf the goods are actually delivered to the carrier in relation to the contract of carriage of goods by sea.
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
During loading or discharging,where the delay is due to the Shipowner’s fault,or that of his servants or agents acting within their authority,the time actually delayed is to be()in calculating lay days.
The invariable result of()average is that the loss falls on the owner of the particular property which has suffered the damage,whether that damage was due to deliberate sacrifice or to an accident.
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
Where a container,pallet or similar article of transport is used to consolidate goods,the number of packages or units enumerated in the bill of lading as packed in such article of transport()to be the number of packages or units in calculating the amount beyond which the carrier or the ship is not reliable.
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
The()enables water to be blow down or emptied from the boilerIt may be used when partially or completely emptying the boiler.
()is entitled to enter into,with a shipper,any agreement,stipulation,condition,reservation or exception as to the responsibility and liability of the carrier or the ship for the loss of or damage to,or in connection with,the custody and care and handling of the goods prior to the loading on,and subsequent to the discharge from,the ship on which the goods are carried by sea.
Although the Shipowner may be responsible for the loss or damage to the goods,his liability may be limited()the terms of the contract or the statute.
广告位招租WX:84302438
题库考试答案搜索网
免费的网站请分享给朋友吧