首页/ 题库 / [多选题]施工物资准备主要包括( )的准备。的答案

施工物资准备主要包括( )的准备。

多选题
2021-09-03 17:16
A、材料准备
B、劳动力准备
C、施工机械准备
D、构配件准备
查看答案

正确答案
A@#@C@#@D

试题解析

感兴趣题目
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
A salvor may be()the whole or part of the payment due under Salvage Convention to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part or if the salvor has been guilty of fraud or other dishonest conduct.
The () is used for hauling in or letting out the wires or ropes.
Vessels must be()valid certificate of nationality or certificated of registry or license.
When loading or discharging dry mud or cement,crew members should use goggles and().
Effects which are dutiable or subject to prohibitions or restrictions should be declared in ().
The()may examine or re-examine the goods or take samples from them straightaway in the absence of the consignee or the consignor whenever it considers this necessary.
()are liable to be stoten, pilfered or may damaged due to improper handing or stowage.
Banks have no liability for any delay or loss caused by postal or telex failure.
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
某城市道路工程项目,施工承包商考虑到该工程受自然条件的影响较大,为了充分利用有限资金,以最快的速度、最少的消耗确保工程优质,创造最好的经济效益和社会效益,加强了对前期质量控制工作。具体控制工作如下: (1)对道路工程前期水文、地质进行实地调查。调查主要从路线方面、路基方面和路面方面进行。 (2)对道路沿线施工影响范围内进行环境与资源调查。 (3)做好城市道路的施工准备工作,施工准备工作的内容主要有组织准备、技术准备、物资准备和现场准备。该工程在施工过程中和施工结束后,施工项目经理部均对其质量控制进行总结、改正、纠正和预防。 问题 1.对道路工程进行前期水文、地质调查的作用是什么? 2.对道路沿线施工影响范围内的环境调查包括哪些内容? 3.对道路沿线境域进行的资源调查包括哪些内容? 4.项目经理部在施工前的组织准备包括哪些内容? 5.项目经理部在施工前的技术准备包括哪些内容? 6.项目经理部在施工前的现场准备包括哪些内容? 7.项目经理部在项目质量控制总结、改正、纠正和预防的过程中,对不合格的控制应符合哪些规定?
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

施工方案是以分部(分项)工程或专项工程为主要对象编制的施工技术与组织方案,其主要内容包括()。
施工部署的内容一般应包括:确定工程开展程序、拟定主要工程项目的施工方案、明确施工任务划分与组织安排以及( )。

某城市道路工程项目,施工承包商考虑到该工程受自然条件的影响较大,为了充分利用有限资金,以最快的速度、最少的消耗确保工程优质,创造最好的经济效益和社会效益,加强了对前期质量控制工作。具体控制工作如下:
(1)对道路工程前期水文、地质进行实地调查。调查主要从路线方面、路基方面和路面方面进行。
(2)对道路沿线施工影响范围内进行环境与资源调查。
(3)做好城市道路的施工准备工作,施工准备工作的内容主要有组织准备、技术准备、物资准备和现场准备。该工程在施工过程中和施工结束后,施工项目经理部均对其质量控制进行总结、改正、纠正和预防。
问题

Mainly east 3 or 4 partly cloudy to overcast occasional rain()slowly south moderate or good.
()any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local quarantine officer must be notified immediately.
Should any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local Quarantine Officer must be()immediately.
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
施工安全技术措施可按施工准备阶段和施工阶段编写,其中,施工准备阶段主要包括技术准备、物资准备、施工现场准备和()。
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
翻译:With Average or With Particular Average(WA or WPA)()
单位工程施工组织设计中的施工准备包括()。
道路工程施工前应做好()、技术和物资等三大准备。
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
广告位招租WX:84302438

免费的网站请分享给朋友吧